首页
登录
职称英语
Water power stations are built______big waterfalls and where the water runs fast
Water power stations are built______big waterfalls and where the water runs fast
游客
2023-09-19
85
管理
问题
Water power stations are built______big waterfalls and where the water runs fast.
选项
A、which are
B、which has
C、where there have
D、where there are
答案
D
解析
本题考查状语从句。分析句子结构可知,空格所填词应和big waterfalls…fast一起构成状语从句,空格前没有表示地点的先行词,因此从句的引导词应用where。表示“哪里有什么”应当用there be结构,且空格后为复数名词big waterfalls,故be动词为复数形式。因此答案选D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3028517.html
相关试题推荐
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt______bigwaterfallsandwherethewaterrunsfast
Waterpowerstationsarebuilt________bigwaterfallsandwherethewaterruns
随机试题
ThedisputebetweentheEuropeanUnionandtheUnitedStatesismainlyabout[br
Thefamilyischanging.Inthepast,grandparents,parents,andchildren【C1】
TheNewOldAgeA)TheJapaneseseniorcitizenswhof
事业单位的专用基金一般包括()。A.固定基金B.职工福利基金C.医疗基金
资料 W市审计局派出审计组,对国有企业KK公司2015年度财务收支进行审计。
患者,女性,34岁,肛周伤口反复破溃伴有少量溢液。在此种情况发生前,患者最可能患
共用题干 Malnutrition"Muchofthesickness
(共用题干)初产妇,第二产程延长,胎儿体重约4000g,行胎头吸引娩出胎儿后30
A.0.5 B.1.0 C.2.0 D.4.0
某公司承接一项地铁隧道工作竖井施工工程,工作竖井净空尺寸15×10m,基坑深26
最新回复
(
0
)