首页
登录
职称英语
Years before President Bill Clinton came to Washington with his campaign ple
Years before President Bill Clinton came to Washington with his campaign ple
游客
2023-09-12
57
管理
问题
Years before President Bill Clinton came to Washington with his campaign pledge to spend an additional $20,000 million annually on America’s infrastructure "to develop the world’s best communication, transportation, and environmental systems," economists and others were talking about the need to spend more on public works. Their debate has been almost entirely about one question: how much more? Usually overlooked in these in discussions is the real infrastructure dilemma of the 21st century--not how much to spend but how to decide what to build and where to build it.
For several reasons, the old ways of deciding these matters simply do not work anymore. Americans today are far more skeptical about the value of new roads, bridges, and sewage treatment plants especially when they are located in their own. backyards. Their faith that decisions about public works can be safely left in the hands of public officials, engineers, and other technical experts is gone.
Reflecting in 1985 upon the final demise of West way, the proposed highway along Manhattan’s West Side that had been held up for 30 years, Senator Daniel Patrick Moynihan of New York wrote, "There is a kind of stasis that is beginning to settle into our public life. We cannot reach decisions. Central park could not conceivably be built today as it was when there was enough power in government to make the decision. We don’t have that capacity."
The persistence of the public works pork barrel (地方建设经费)—funding blatantly political projects--has also contributed to public skepticism. In the same year that Moynihan decried the death of Westway, local politicians the $1,800 million Tennessee Tombigbee Waterway, recently described by the Atlanta Journal Constitution as "a broken promise." A classic pork barrel project, the waterway carries only one-tenth the commercial barge traffic that had been projected. [br] Tennessee-Tombigbee Waterway was called "a broken promise" became______.
选项
答案
it carries little that had been projected
解析
细节理解题。问题的“结果”在文中最后—段…recently described by the Atlanta Journal Constitution as“a broken promise”,原因是The waterway Carries only one tenth the commercial barge traffic that had been projected.答案中用“little”代替“one tenth the commercial barge traffic”以达到简答目的。
转载请注明原文地址:https://tihaiku.com/zcyy/3006777.html
相关试题推荐
[originaltext]Yearsagobeforetherewererefrigerators,anicehousewasab
[originaltext]Yearsagobeforetherewererefrigerators,anicehousewasab
【S1】[br]【S8】women--men此处是说,女士通过某种方法改变着澳大利亚的劳动力市场,before说明这种工作以前是男士做的,而非女土做的,故应
【S1】[br]【S2】before--afterIt指代的是“女士加入劳动力大军”,而女性加入劳动力大军是在澳大利亚出现第一位女总理之后的一段时间。bef
[originaltext]TheAmericansbelievethatanybodycanbecomePresidentofthe
[originaltext]TheAmericansbelievethatanybodycanbecomePresidentofthe
[originaltext]TheAmericansbelievethatanybodycanbecomePresidentofthe
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
随机试题
Silenceisunnaturaltoman.Hebeginslife______acryandendsitinstillness.
[originaltext]Accordingtoasurveyonreadingconductedin2001bytheUS
从价值链分析的角度,作业成本管理将成本看作“增值作业”和“不增值作业”的函数并以
A.放射性膀胱炎 B.两者均有 C.两者均无 D.放射性直肠炎宫颈癌放疗后
急性中度有机磷农药中毒患者全血胆碱酯酶活性一般为A.50%~70% B.
每张应用到麻醉药品片剂、酊剂、糖浆剂的处方,连续使用不得超过A.1日B.2日C.
被派遣劳动者与用工单位正式员工享有平等的法定劳动权利,包括()A:参加工会的权利
T型甲亢患者的实验室检查结果是A.TT、TT、FT和FT均增高,TSH降低 B
甲公司是一家互联网叫车平台公司,目前经营处于培育客户的阶段。该公司通过支付大量的
喷锚暗挖(矿山)法施工隧道的衬砌主要为()衬砌。A.复合式 B.单层喷锚
最新回复
(
0
)