首页
登录
职称英语
[originaltext] It is barely half a century since parts of the Thames were de
[originaltext] It is barely half a century since parts of the Thames were de
游客
2023-08-16
69
管理
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £ 10 million open-air swinuning pool in the middle of the Thames in Central London.
(12)Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.(13)Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
(14)The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic.(15)Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £300,000 to cover consultancy costs and other fees would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
Questions 12 to 15 are based on the passage you have just heard.
12. What can we learn about Germany?
13. What do people concern about the project?
14. What is the function of the glass partition?
15. Where is the initial money of the project likely to come from?
选项
A、To separate the changing rooms from the pool.
B、To provide a path to the swimming area.
C、To make the pool shallow enough for children.
D、To protect people from waves caused by river traffic.
答案
D
解析
转载请注明原文地址:https://tihaiku.com/zcyy/2929811.html
相关试题推荐
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]W:Whenwasthelasttimeyouwentforawalkinyourlocalpark?
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Imagineabigexplosionasyouclimbthrough3.000ft.Imagin
[originaltext]Currentstudiesshowthatwhatgoesonlabelsisanimportant
[originaltext]Currentstudiesshowthatwhatgoesonlabelsisanimportant
[originaltext]I’msureyourealizethatyourresearchpapersaredueinsix
[originaltext]M:Goodmorning,Dr.Smith.MynameisPeter.Iamafreshmanin
随机试题
[originaltext]W:WillyoubehavingThanksgivingathomeorwillyoubegoingt
If$10,000isinvestedatasimpleannualinterestrateof6percent,whatisth
错图中交通标线显示,该车道的机动车只能右转,不能直行。
根据所示梁的弯矩图和剪力图,判断为下列何种外力产生的?( )
金属贴面工程施工质量控制点的预防措施包括()。A.吊顶内基层应将模板、松散混凝
1970年写成并出版了《终身教育引论》而成为终身教育理论的积极倡导者和理论奠基者
通草药材的药用部位是A:带根全草B:块茎C:茎髓D:根茎E:地上部分
按照使用用途分,房源一般可以分成()。A:住宅 B:办公楼 C:厂房 D
开放性气胸患者现场急救的首要措施是A:镇静、止痛 B:吸氧、输液 C:应用抗
甲公司2015年年末库存乙材料的账面余额为1500万元,年末计提跌价准备前账面
最新回复
(
0
)