首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-18
38
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is ______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
第三段倒数第二、三句。选项中的内容在文中都提到了,但最危险的是:Uncovered piles of tailings give off radioactive radon gas.Once in the air,the gas rinds its way into the water supply and the food chain。显然这种放射性气体才是最有害的。文中没有明确的答案,但从危害性上讲,其他三个选项都没有直接说到它们的害处。
转载请注明原文地址:https://tihaiku.com/zcyy/2847882.html
相关试题推荐
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
[originaltext]M:Ihaveneverheardsuchafascinatinglectureonsolarenergy.
Billscompletedby2000laidspecialemphasis______recyclingandenergyconver
Whileweaxemakingmoreuseofnuclearpowertomeettheenergydemandweshoul
Ifwegoonconsumingenergysowastefully,______areouroilwellswillbedri
______thefirsttousenuclearweapons.A、AtnotimeChinawillbeB、NeverChina
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
随机试题
我们已经把今年拨给我们的全部经费都花光了。(allocation)We’vespentourentireallocationfortheyear.
HistoryofSpecialSchoolsOneofthefirstspecialschoolsintheworldwa
Jan.6issue--Theweatheroutsidewasicy,butinside,250journalistswere
运输价格形成的客观基础是( )。A.运输成本 B.运输价值 C.运输效用
婴儿维生素D的RNI为A、200IU/d B、600IU/d C、400IU
面积量算内容包括( )量算。A.地块面积量算 B.土地利用面积 C.地块面
对消渴病的辨证应着重辨A.病位 B.标本 C.寒热 D.气血
(2021年真题)根据合同法律制度的规定,下列关于承揽合同的表述中,正确的是(
某工程双代号时标网络计划如下图所示,由此可得正确的结论有()。 A.工作A为
低压电气保护装置有热继电器、熔断器、配电箱和配电柜,高压电气保护装置有电力变压器
最新回复
(
0
)