首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
41
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
推断题。选项中的内容在文中均有提及,但是从危害性上讲,选项A、B、D都没有直接说到它们的害处,而文中第三段讲到Uncovered piles of tailings give off radioactive radon gas.Once in the air,the gas finds its way into the water supply and thefood chain.故可推断出这种放射性气体才是最有害的。故选项C正确。
转载请注明原文地址:https://tihaiku.com/zcyy/2811848.html
相关试题推荐
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
Whatdodietingandenergypolicyhaveincommon?TheSnackWelleffect.The
随机试题
[originaltext]M:Jane,youseemtohaveworkedovertimeatyouroffice.W:Tha
Thelandofapplepieandbaseball—theUnitedStatesofAmerica.Ofcourse
Therearemanyargumentsforandagainsttheinterviewasaselectionproced
Of2,000commercialbeekeepersintheUnitedStatesabouthalfmigrate.Mi
错误叙述栓剂的是()。A.可起局部作用B.可起全身作用C.是半固体制剂D.可避
、浇筑大体积混凝土质量控制措施正确的有( )。 A、混凝土养护得当 B、
如做心电图,最有确诊意义的结果是( )。A.T波低平 B.T波高耸 C.Q
在环境温度为23℃时,湿度测量值为183uL/L,20℃湿度折算值为()uL
共用题干 小李是某外资企业的一名职员,在该企业已经工作了六年。在六年的一时间里
某办公楼供电电源10kV电网中性点为小电阻接地系统,双路10kV高压电缆进户,楼
最新回复
(
0
)