首页
登录
职称英语
共用题干 第三篇Listening Device Provides Early
共用题干 第三篇Listening Device Provides Early
最全题库
2022-08-02
102
问题
共用题干第三篇
Listening Device Provides Early Landslide(山崩;地滑;塌方)Warning
A device that provides early warning of a landslide by monitoring vibrations(振动)in soil is being tested
by UK researchers,The device could save thousands of lives each year by warning when an area should be
evacuated(疏散,撤走),the scientists say. Such natural disasters are common in countries that experience
sudden, heavy rainfall (降雨,降雨量), and can also be triggered by earthquakes and even water
erosion(腐蚀,侵蚀).
Landslides start when a few particles of soil or rock within a slope start to move,hut the early stages can
be hard to spot.Following this initial movement,"slopes can become unstable in a matter of hours or
minutes,"says Nell Dixon at Southborough University,UK. He says。warning system that monitors this
movement"might be enough to evacuate a block of flats or clear a road,and save lives".
The most common way to monitor a slope for signs of an imminent(即将发生的) landslide is to watch
for changes in its shape. Surveyors can do this by measuring aside directly,or sensors(传感器)sunk into
boreholes(钻孔,井眼)or fixed above ground can be used to monitor the shape of a slope. Slopes can,
however,change shape without triggering a landslide,so either method is prone to causing false alarms.Now
Dixon's team has developed a device that listens for the vibrations caused when particles begin moving
within a slope.
The device takes the form of a steel pipe dropped into a borehole in a slope.The borehole is filled in
with gravel(砾,沙砾,砾石)around the pipe to help transmit high-frequency vibrations generated by particles
within the slope.These vibrations pass up the tube and are picked up by a sensor on the surface.Software
analyses the vibration signal to determine whether a landslide may be imminent.
The device is currently being tested in a 6-metre-tall artificial clay embankment(堤岸)in Newcastle,
UK.Early results suggest it should provide fewer false positives than existing systems.Once it has been
carefully and thoroughly tested,the device could be used to create a complete early-warning system for
dangerous slopes.
"Locations with a significant risk of landslides could definitely benefit from a machine like this,"says
Adam Poulter,an expert at the British Red Ci?oss,"As long as it doesn't cost too much."But,Poulter adds
that an early-warning system may not be enough on its own."You need to have the human communication."
he says,"Making systems that get warnings to those who need them can be difficult."What does"Such natural disasters"in the first paragraph refer to?A:Sudden,heavy rainfall.B:Earthquakes.C:Water erosion.D:Landslides.
选项
What does"Such natural disasters"in the first paragraph refer to?
A:Sudden,heavy rainfall.
B:Earthquakes.
C:Water erosion.
D:Landslides.
答案
D
解析
短文第一段第一句提到了山体滑坡,此处的自然灾害指的是上文的山体滑坡,故选D。
短文第二段第一、二句提到“滑坡开始时,一个山坡上的土壤或岩石粒子移动,但初期 可能很难辨认。然后山坡在数小时或数分钟内可能变得不稳固”,故选D。
短文第三段倒数第二句提到“……任何一种方法(普通方法)都可能产生错误预警”,故 选C。
根据短文第四段第二句可知,地上凿出的洞而非该装置是用砾石填充的,A项的叙述不 正确。故选A
此句意为“早期的结果表明它应该提供比现有系统更少的不实证据”,故选B。 positive 意为“确凿的证据”。第5部分:补全短文
转载请注明原文地址:https://tihaiku.com/zcyy/1494597.html
本试题收录于:
理工C题库理工类分类
理工C
理工类
相关试题推荐
共用题干 2010年4月,H省经济特区A市市民王某通过B房地产中介服务公司在A
共用题干 2010年4月,H省经济特区A市市民王某通过B房地产中介服务公司在A
共用题干 W房地产公司于2010年3月1日,通过出让方式,获得B市C县规划区内
共用题干 W房地产公司于2010年3月1日,通过出让方式,获得B市C县规划区内
共用题干 W房地产公司于2010年3月1日,通过出让方式,获得B市C县规划区内
共用题干 甲房地产开发公司(以下简称甲公司)获得了某城市规划区内一地块的土地使
共用题干 2010年5月,李某在W省A市(非经济特区)天利花园购买商品房一套。
共用题干 2010年5月,李某在W省A市(非经济特区)天利花园购买商品房一套。
共用题干 SpoiltforChoiceSomeresearchwhi
共用题干 SpoiltforChoiceSomeresearchwhi
随机试题
Theydidn’t______theweddingbecauseofaheavyrain.A、joinB、takepartC、attend
Whatdoesthespeakersayaboutthechoicesyoumake?[originaltext]Althoughnot
Thepolicehavereceived______informationthatthewantedmurdererisstillon
商业银行的核心资本
目前台湾居民来往大陆通行证分为()年有效和3个月一次有效两种。A.1 B.3
(2016年真题)下列关于股份有限公司设立的说法,错误的是( )。A.应当有符
对整站开展的红外测温、局放测试等带电检测项目,可编制一张标准卡
绩效考核方法中,常用于企业中层和基础管理人员的是()。A、量表法 B、比
某企业只生产一种产品,单价为10元,单位变动成本为6元,固定成本5000元,销量
下列各项中,通常无需包含在审计业务约定书中的是()。A.财务报表审计的目的与范围
最新回复
(
0
)