During the installation of the groove, the total cross-sectional area of the conductor including insulation in the same groove shall not exceed the inner cross-sectional area of the groove. ( ) 。在线槽安装过程中,同一线槽内包括绝缘在内的导线截面积总和应该不超过线槽内部截面积的 ( ) 。A.20%B.40%C.60%D.80%
选项
A.20%
B.40%
C.60%
D.80%
答案
B
解析
转载请注明原文地址:https://tihaiku.com/congyezige/2412009.html
本试题收录于:
中级 信息系统监理师题库软件水平考试初中高级分类
中级 信息系统监理师
软件水平考试初中高级
相关试题推荐
Workaroundsaredeterminedduringwhich
Onetoolthatisusefulduringbothanal
Duringplanningyousitdownandestimat
Duringtheinstallationofthegroove,t
Duringtheimplementationoftheproject
Duringtheinstallationofthegroove,th
Duringtheimplementationoftheproject
随机试题
Toacomparativeeducationalistmanyquestionsabouttheselectionandtrai
IntheUnitedStatesandinmanyothercountriesaroundtheworld,thereare
Whichofthefollowingphrasesindicatesasubject-predicaterelationship?A、The
下列句中加点的词解释没有错误的是()A.古者使车毂击驰,言语相结。(相互结交)
常用的各种水泥首先()必须合格,才能使用否则不宜使用。A.强度 B.凝结
关于耕地占用税的表述中,错误的是()。A.耕地占用税以纳税人实际占用耕地面积
女童,7岁,食冷饮时左后牙感到酸痛2周,无自发痛史,检查:颊面深龋,龋蚀范围稍广
集合调查法的主要缺点是( )。A.漏填多有发生 B.被调查者间的影响会导致调
组织建设工程流水施工时,划分施工段的原则有()。 A.同一专业工作队在各
A.痰结核菌检查 B.结核奁素试验 C.X线检查 D.X线胸片检查 E.
最新回复
(
0
)