( )the process of determining,document
( )the process of determining,document
免费题库
2022-08-02
77
问题
( )the process of determining,documenting,and managing stakeholder needs and requirements to meet Project objectives.A.Plan Scope ManagementB.Collection RequirementsC.Validate ScopeD.Control Scope
选项
A.Plan Scope Management
B.Collection Requirements
C.Validate Scope
D.Control Scope
答案
B
解析
(收集需求)确定、记录和管理利益相关者需求和要求以满足项目目标的过程。
A.规划范围管理
B.收集需求
C.确认范围
D.控制范围
转载请注明原文地址:https://tihaiku.com/congyezige/2298491.html
本试题收录于:
高级信息系统项目管理师题库软件水平考试初中高级分类
高级信息系统项目管理师
软件水平考试初中高级
相关试题推荐
()istheprocessofmonitoringthest
()includestheprocessforincorporat
( )isaprocessofmonitoringthestatu
Managingriskanddocumentingthemisve
PlanQualityistheprocessofidentifyi
()istheprocessofidentifyingindivi
Integration()istheprocessofverify
The()processanalyzestheeffectofrisk
Managingriskanddocumentingthemisve
Agoalofthe()processistodetermin
随机试题
Apartfromaninteresting-lookingcarveddagger,theboxwasfullofcrockery,m
TheheadoftheMuseumwas_____andletusactuallyexaminetheancientmanuscrip
RESUME
Wedon’thavemanychancestowritecompositionsasassignment.______(在这
以下幕墙中,不属于框支承构件式玻璃幕墙的是()A.明框玻璃幕墙 B.单元式
阅读一位教师讲授八年级课文《阿长与(山海经)》两个环节,完成下列题。 环节一:
下列为补体活化裂解后的小片段的是A.Clb B.C2b C.C3b D.C
A.必须持有国务院药品监督管理部门发给的《进口准许证》 B.国务院有权限制或者
同一街道不可以有两个或多个路线价。()
根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013,下列()不是
最新回复
(
0
)