首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] According to th
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] According to th
游客
2025-02-07
20
管理
问题
Art Murals
[br] According to the discussion, what factors should be considered in planning a mural? Click on two answers.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、The position of the observer
B、The character of the artist
C、The architecture of the room
D、The colors of the paint
答案
AC
解析
In planning a mural, the position of the observer should be considered: We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. The architecture of the room should also be considered: A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design....(2.2)
转载请注明原文地址:http://tihaiku.com/zcyy/3946732.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0628_20124[/img][br]Whydoestheprofessorme
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]WhatisNOTtrueaboutvi
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Arethesestatementstrue
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whyarescientistsunsure
随机试题
Afteryearsofpromisesandfalsestarts,booksellersandtechnologycompanie
Istheglasshalf-fullorhalf-empty?Dependswhetheryou’reanoptimistor
【教学过程】 (一)课程导入 1.教师提问 请同学们回想一下最近一个月成功的三件事和失败的三件事,然后请你试着分析一下成功和失败的原因是什么。分享一
《消费者权益保护法》规定的经营者的义务不包括()的义务。A.接受监督 B.接
一般起重机械设备自身的安装、拆卸属于超过一定规模的危险性较大的分部分项工程范围。
案例: 阅读下面的学生习作,完成题: 雨润万物.馨香满天 ①初春时节
基金合同所包含的重要信息不包括()。A.基金的持有人结构 B.基金的投资
处在海水、海风、氯离子环境的路面桥面钢筋混凝土,宜添加的外加剂是( )。 A
贷款人应将固定资产贷款纳入对借款人及借款人所在集团客户的统一授信额度管理,并按区
背景资料: 某新建水闸工程的部分工程经监理单位批准的施工进度计划如图所示(单
最新回复
(
0
)