首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-06
20
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, the term "uranium mine tailings" refers to_____.
选项
A、the uranium that is taken from a mine
B、the ponds that hold liquid radioactive wastes
C、solid wastes that result from the mining of uranium
D、dangerous radon gas that escapes from uranium mines
答案
C
解析
词汇题。短文第三段中间提到Uranium tailings are solid materials in theslurry(or watery mixture)of depleted ore—bearing rock;chemicals,and liquids thatresult from milling.意思是:铀废料是加工所产生的由废弃的矿岩石、化学物和液体所组成的流质混合物中的固体物质。tailings在这里指“残渣,废料”。故选项C正确。
转载请注明原文地址:http://tihaiku.com/zcyy/3428117.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
Displayingaheightenedsenseof______,manyofauthorMariaCristinaMena’scha
Singaporeiswellknownasamulti-racial,multi-culturalandmulti-religiousna
梁的内力包括梁截面上()。A.剪力 B.弯矩 C.支座反力 D.拉力
()是在对项目的建设规模、产品方案、技术方案、设备方案、选址方案和工程建设方案
A.st B.ID C.sos D.bid E.qd每日1次
范围经济是由厂商的经营范围而非规模带来的经济,是指同时生产两种产品的费用低于分别
(2020年真题)阅读下面材料,根据要求写作文。 材料一: “人的一生应当这
下列建筑中,应设置环形消防车道的有()。A.某建筑高度24m的商店,占地面积2
古人云,“先天下之忧而忧,后天下之乐而乐…‘富贵不能淫,贫贱不能移,威武不能屈”
下列选项中,属于项目经理职责的有()。A.对项目目标进行系统管理 B.进行资源
最新回复
(
0
)