首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-07
29
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
推断题。选项中的内容在文中均有提及,但是从危害性上讲,选项A、B、D都没有直接说到它们的害处,而文中第三段倒数第二句讲到Uncovered piles of tailings give off radioactive radon gas.Once in the air,thegas finds its way into the water supply and the food chain.故可推断出这种放射性气体才是最有害的。故选项C正确。
转载请注明原文地址:http://tihaiku.com/zcyy/3429452.html
相关试题推荐
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
Bynow,everyoneknowsyousaveenergybyturningoutlights.Andyou【S1】___
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
随机试题
[originaltext]W:Atwhattimecanweworkoutadeal?[/originaltext][audioFiles
Scienceisadominantthemeinourculture.Sinceittouchesalmosteveryfa
Onthisdayayearago,ayoungwomanlaydying,inacoldandspartanhouse
在必须进行招标范围内的工程建设项目,下列选项中,必须招标的有( )。A.施工单
对于线性流水,在每段经过的时间相等的情况下,流水线的效率与()成正比。A.任务
在对沥青混凝土面层检验与评定时,对沥青路面原材料、施工质量控制的原始数据等环节有
畸形发生及其严重程度与下列因素无关的是A.不良习惯的发生原因 B.不良习惯的作
患者,女性,27岁。双手近端指间关节痛2个月,有时肿胀,伴不规则低热,晨起后关节
依据《通用安装工程工程量计算规范》(GB50856—2013),下列项目中属于
A.查对显示器 B.调节显示器 C.读数显示器 D.警戒显示器 E.追踪
最新回复
(
0
)