问题
All of followings should be done by the project manager during project control except ().A.Determine the a change has occurredB.Ensure that a change is agreedC.Make sure all changes are approveD.by managementD.Manage changes as they occur
选项
A.Determine the a change has occurred
B.Ensure that a change is agreed
C.Make sure all changes are approveD.by management
D.Manage changes as they occur
答案
B
解析
译文:项目经理不应该在项目控制过程中执行的工作是()。
A)确定变更已经发生
B)确保变更已达成共识
C)确保所有变更都获得管理层批准
D)在变更发生时,对变更进行管理
转载请注明原文地址:http://tihaiku.com/congyezige/2299754.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
Alloffollowingsshouldbedonebythe
随机试题
ItisincongruousthatthenumberofBritishinstitutionsofferingMBAcours
ECO-TOURISMIfyoustillbelievetheonce-commonly
Twentyyearsago,atallyoungwomanwithashysmileflubbedherlinesbefo
下列不符合泡沫消火栓安装要求的是()。A.一般情况室外管道选用地上式消火栓
A. B. C.增加x D.减少x
釉板的形成是由于A.制作磨片时人工裂隙 B.龋损形成后再矿化 C.釉质发育期
硅芯管内壁动态摩擦系数为:≤0.15(圆鼓法)。()
军事禁区管理单位的范围的划定是通过()确定的。A.为陆地军事禁区修筑围墙,设
股票S的价格为28元/股。某投资者花6.8元购得股票S的买方期权,规定该投资者可
除股份有限公司以外的其他类型的企业,在企业创立时,投资者认缴的出资额与注册资本一
最新回复
(
0
)