首页
登录
职称英语
Date: 01/15/2011From: Edna PerthTo: Alex YoungSubject: Facilities at the Gran
Date: 01/15/2011From: Edna PerthTo: Alex YoungSubject: Facilities at the Gran
游客
2025-06-16
21
管理
问题
Date: 01/15/2011
From: Edna Perth
To: Alex Young
Subject: Facilities at the Grand
Alex,
As requested, toured the facilities at the Grand International Hotel a week ago. Their two first-floor ballrooms should be large enough to accommodate the main conference events. Also, just down the hall are several smaller meeting rooms where we can stage the panels and seminar discussions.
Unfortunately, our options for dining are not as conveniently positioned. The hotel runs an open-air courtyard cafe just outside the main ballrooms, but there isn’t much seating space— only about 100 chairs. A more spacious and elegant choice would be the Grand International Restaurant, but it’s on the third floor, on the other side of the hotel. I’ll leave it to you to decide which location would be best for the introductory luncheon on the first day.
And, of course, I still haven’t heard when exactly the conference will be held. Haven’t you picked a weekend yet? As soon as you do, please contact Regina Lim, the events coordinator at the Grand International. Her number is 555-6392.
Edna
Date: 01/24/2011
From: Alex Young
To: Edna Perth
Subject: RE: Facilities at the Grand
Edna, thanks for your email, and I apologize for my delay in getting back to you.
To answer your last question—yes, a date for the conference has been set. It will run from Friday, February 16, to Sunday, February 18. I’ve already called Regina, and everything is arranged.
As for Friday’s luncheon, I believe the outdoor dining area will be adequate. We don’t expect more than 80 participants to be there for the introductory event. Then, for the group lunch on Sunday, we can use the hotel’s main restaurant.
Have you started preparing your presentation? I just spoke with Bill Waters, who’s giving the keynote address on Sunday, and he was quite nervous. In fact, I should go help him with it now.
See you soon,
- Alex [br] When was Ms. Perth at the hotel?
选项
A、January 8
B、January 15
C、January 24
D、January 31
答案
A
解析
转载请注明原文地址:https://tihaiku.com/zcyy/4121625.html
相关试题推荐
Date:01/15/2011From:EdnaPerthTo:AlexYoungSubject:FacilitiesattheGran
Date:01/15/2011From:EdnaPerthTo:AlexYoungSubject:FacilitiesattheGran
Date:01/15/2011From:EdnaPerthTo:AlexYoungSubject:FacilitiesattheGran
SportsandrelaxationfacilitiesIfyouneedtoworkoutorjustchillout,you
SportsandrelaxationfacilitiesIfyouneedtoworkoutorjustchillout,you
Thesafetyinspectorhasadvisedusthatourhealthandsafetyfacilitiesaremo
From:GuillermoGrimaldiTo:SamanthaYoungSubject:SurveyResultsWehavethe
From:GuillermoGrimaldiTo:SamanthaYoungSubject:SurveyResultsWehavethe
From:GuillermoGrimaldiTo:SamanthaYoungSubject:SurveyResultsWehavethe
Forourhotelguests,thevariousfacilitiesincludingthesaunaandindoorswim
随机试题
ThedirectorshaveameetingeveryFriday,unlessthereisnothingtodiscuss.W
Theworldisthrowingawayashockingamountoffood.Areport(1)_____that
[img]2021m3x/ct_ve01004002m_eyyjsbcloze_0149_202103[/img]Ithasbeenjus
ASalesManagerWantedHunanMilkGroupisafamous
押品价值评估是押品管理的重要环节,下列选项中,属于押品价值评估方式的有( )。
A.琥珀酸亚铁 B.叶酸及维生素B C.EPO D.雄激素 E.强的松治
Thechangeinthatvillagewasmiraculou
承受竖直向下载荷的等截面悬臂梁,结构外分别采用整块材料、两块材料并列、三块材料并
心电图Ⅱ、Ⅲ、aVF,V6、V7导运动后出现ST段水平下降,最可能涉及的冠状动脉
某新建泵站采用堤后式布置,主要工程内容包括:泵房、进水闸、防洪闸、压力水箱和穿堤
最新回复
(
0
)