首页
登录
职称英语
•You will hear a bank expert talking about some of the common mistakes that are
•You will hear a bank expert talking about some of the common mistakes that are
游客
2025-06-02
52
管理
问题
•You will hear a bank expert talking about some of the common mistakes that are made when people complete letters of credit.
•As you listen, for questions 1—12, complete the notes, using up to three words or a number.
•You will hear the recording twice.
COMMON MISTAKES OF FINISHING A CREDIT LETTER
NOTES
Reasons for rejecting 25% of the documents:
1. The letter of credit had______
2. The documents were presented after the period stipulated in the______
3. The shipment was______
Documents were often Inconsistent with one another In the following ways:
4. The description or spelling of goods on invoice(s) differed from that in the______
5. The weights differed between______
6. The amounts of value shown on the invoice(s) and bill of exchange (draft)______
7. The marks and numbers______
8. The drawing was for less than the letter of credit______
9. The letter of credit was exceeded by the value of the______
10. The shipment was______
11. There was an absence of signatures of witnessings, where required, ______
12. Facsimile signatures were used when not______ [br]
Now you’d be surprising at the kinds of mistakes people make when using letter of credit documentation. These errors can often lead to rejection on the very first presentation. The research department of our bank found that 25% of the documents were rejected. Now there were different reasons. The main ones were things like the fact that the letter of credit had expired, or the documents were presented after the period stated by the letter of credit. Or, of course, the shipment was late.
If you think about it, it is quite amazing really. But I can’t stress enough the need for consistency between different documents. I mean, for instance, our bank study found out that spelling inconsistencies or mistakes are part of the problem. That is the description or spelling of goods on invoices was different from that in the letter of credit. Or, the weights were different on the export documents. Then the amounts of money value shown on the invoice and the bill of exchange differed too. Even the marks and numbers were found, to be different. Then another thing we found was that the amount of money mentioned on the letter of credit was smaller than the value of the order. Or, the shipment was short. Then you might even find that some documents were missing which were called for in the documentary letter of credit. We even had cases where signatures had not been witnessed as. required for certain documents presented. Or else facsimile signatures were used where they’re just not allowed. And this is by no means the end of the list, which goes on and on~ but I won’t bore you any more. All in all almost 50% of the documents presented along with the letters of credit were rejected on their first presentation and this meant sometimes long delays in payment with all the complications that can involve. And I don’t need to tell you.
选项
答案
SHORT
解析
转载请注明原文地址:https://tihaiku.com/zcyy/4101531.html
相关试题推荐
•Youwillhearfivedifferentbusinesspeopletalkingaboutpartnerships,onefo
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearabankexperttalkingaboutsomeofthecommonmistakesthatare
•Youwillhearfivedifferentbusinesspeopletalkingaboutbusinesssecrets
•Youwillhearfivedifferentbusinesspeopletalkingabouthowtheystarted
随机试题
ThetwoclawsofthematureAmericanlobsteraredecidedlydifferentfromeac
Whensheheardthebadnews,she______completely.A、brokeawayB、brokeupC、bro
()跳高滑雪()成本会计[br]()交通规则()蓝牙技术I、F
按结构层次分类,城镇道路的组成有()。A.路基 B.垫层 C.基层 D.
幼儿身心发育尚未成熟,所以事事需要成人的精心照料,尽量不要让幼儿动手,以免受到伤
下列关于气体灭火系统阀驱动装置不动作的处理原则的说法正确的是()。(A)
关于固定总价合同特点的说法,正确的是()。A.合同执行过程中,由于市场因素造成工
单位建筑工程预算的费用项目包括( )。A.建筑安装工程费用、设备及工器具购置费
甲建设单位和乙施工企业在签订的施工合同中约定:“甲方于工程交付使用后15日内结清
关于矩阵组织结构的说法,正确的有()。A.矩阵组织结构是一种传统的组织结构模式
最新回复
(
0
)