首页
登录
职称英语
You will hear a recording that a training manager has made for his assistant, de
You will hear a recording that a training manager has made for his assistant, de
游客
2025-06-01
18
管理
问题
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1-12, complete the notes using up to three words or a number.
After you have listened once, replay the recording.
TRAINING DAY FOR STANDFORD’S
THINGSTO DO
Ring Swan Hotel, request【L1】______(in addition to other equipment booked).
Cancel【L2】______
Remind participants to bring the【L3】______they’ve received to the training day.
Tell Standford’s that the title of the talk by the guest speaker is now【L4】’______’.
PROGRAMME
Morning
9.15: Talk on: The value of【L5】______in business
10.00: Workshop: 【L6】______
11.15: Discussion: 【L7】’______’
12.00: Role play: 【L8】______
1.00: Lunch
Afternoon
2.00: Session: 【L9】______
3.15: Either
Presentation: 【L10】’______’
or
Workshop: 【L11】’______’
4.00: 【L12】______
5.00: Finish [br] 【L1】
Part One. Questions 1 to 12.
You will hear a recording that a training manager has made for his assistant, describing plans for a training day that he will be running with his colleague, Julia.
As you listen, for questions 1 to 12, complete the notes, using up to three words or a number.
After you have listened once, replay the recording. You now have 45 seconds to read through the notes.
[pause]
Now listen, and complete the notes.
[pause]
I hope you don’t mind me leaving a recording, but something has cropped up and Julia and I have had to go off to head office, so we can’t speak to you in person. We’ve finalised our plans for the management training day we’re putting on for Standford’s on the seventeenth of next month, so could you take the necessary action, please.
The most urgent thing is to contact the venue, that’s the Swan Hotel, and get them to provide a camcorder as well as the video recorder and TV we’ve already booked, as ours isn’t working and I don’t think we can get it fixed in time. And at the same time, because we’ve rethought how to run the first workshop, we won’t be needing the OHPs after all, so you might as well cancel those.
Oh, and when you send the programme to the participants, could you point out that the case study we’ve already circulated to them is for the discussion slot: otherwise I’m sure half of them will forget to take it with them.
Then you’d better ring Standford’s, and tell them that the guest speaker has agreed to change her topic to ’Benefits from coaching’: we managed to persuade her that ’Financial instruments’ would be too heavy for the end of the day!
Right, now we’ve finalised the programme, so could you get it typed up? Here’s the running order. It’s a nine o’clock start and naturally, we’ll introduce ourselves and outline the programme. It’ll be a good idea for us to make everybody really alert as a priority, so at nine fifteen we’re starting with my talk on physical fitness, which is about its importance at work. The payoff is that Julia can take over at ten and do her session on team motivation - that’ll be a workshop format.
Now that’ll take us to a mid-morning break at ten forty-five. I don’t think they should have too long, as we don’t want to lose momentum. The obvious thing to follow the break is the discussion session, which we’re calling ’Performance Improvement’, because it’s an extension and application of what Julia will have been talking about before the coffee break, and should provide food for thought. By the time that’s over, at twelve o’clock, some of them will be beginning to lose concentration before lunch, and we should end the morning with a role play. This went so well last time. It’ll be focusing on negotiating strategies. It should make an interesting session.
I think that’ll leave them in a positive frame of mind for lunch at about one. Julia will start the afternoon at two with her session on troubleshooting. I’m sure participants will come up with plenty of questions about that. Then at three fifteen, we’ve got the two parallel sessions.
They can choose the presentation ’Management Models’, which will be aimed mostly at the less experienced participants, but there’ll be a workshop at the same time on ’Succession Planning’, which might appeal mostly to more senior managers. It’s something that too few companies think about until it’s too late. Then at four o’clock, we’ll bring everyone together for the keynote speech. We thought of setting aside a time for questions and answers, but quite honestly they’ve got most of the day for that, so we won’t bother.
OK, that’s all, so if you could deal with that today or tomorrow, I’d be most grateful.
选项
答案
(A) CAMCORDER / VIDEO CAMERA
解析
转载请注明原文地址:https://tihaiku.com/zcyy/4098964.html
相关试题推荐
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
•YouwillhearaconversationbetweenSuzanne,apersonnelmanager,andKevin,
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
Youwillhearadiscussionbetweentwomanagers,KathyandDuncan,whoworkint
随机试题
居民消费价格指数(CPI)不但与人们的生活密切相关,在国家的价格体系中也占有很重要的地位。CPIisnotonlycloselyrelatedto
某软件项目的活动图如下图所示,其中顶点表示项目里程碑,连接顶点的边表示包含的活动
某新建建设项目的基础数据如下: 1.建设期2年,运营期10年,建设投
霍乱大流行最重要的传播形式是A、食物污染 B、苍蝇传播 C、接触患者 D、
中国证监会派出机构依法对证券公司及其分支机构的融资融券业务活动中涉及的()等进
Thechangeinthatvillagewasmiraculou
A.量筒 B.量杯 C.滴定管 D.容量瓶 E.吸量管用于配制准确体积的
巴赫是晚期巴洛克音乐的杰出代表,他的去世标志着巴洛克音乐的终结。同属于巴洛克音乐
湿式室内消火栓系统连锁控制方式,应将()等信号作为触发信号,直接控制启动消火栓
(2019年真题)建设单位采用工程总承包模式的优点有( )。A.有利于缩短建设周
最新回复
(
0
)