首页
登录
职称英语
Read the article below about the function of a project coordinator. In m
Read the article below about the function of a project coordinator. In m
游客
2025-05-18
20
管理
问题
Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible. [br] 【M10】
选项
答案
ACTUALLY
解析
be expected to do意为“被期望做某事”,修饰动词的副词应放在do的后面,且ACTUALLY与此处语义不符,故多余。
转载请注明原文地址:https://tihaiku.com/zcyy/4081016.html
相关试题推荐
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
随机试题
【S1】[br]【S4】beaten→beat这里谓语动词应用过去式,而不是过去分词。故应将beaten改为beat。
TheAmericanfarmershavealwaysbeenindependentandhard-working.Inthe
TomSmithwasawriter.Hewrotestoriesformagazines.Oneeveninghecould
Comparisonsweredrawnbetweenthedevelopmentoftelevisioninthe20thcen
影响健康的因素,主要包括A:自然环境^社会环境、遗传、心理、经济 B:遗传、心
下列关于期货公司营业部超出经营范围开展经营活动所承担民事责任的表述,正确的有(
农业生产具有不稳定性和资金需求的不平衡性,体现了农村金融的()特点。A.涉及面
在费用标准的适用范围中,()适用于井筒冻结、地面预注浆等特殊措施工程和大钻机钻井
某分项工程的混凝土成本数据如下表所示。应用因素分析法分析各因素对成本的影响程度,
建设工程施工招投标程序中,评标阶段初步评审环节对商务标的审查内容是()。A
最新回复
(
0
)