Read the article below about the function of a project coordinator.
In most of the lines(34-45), there is one extra word. It either is grammatically incorrect or does not fit in with the meaning of the text. Some lines, however, are correct.
If a line is correct, write CORRECT on your Answer Sheet.
If there is an extra word in the line, write the extra word in CAPITAL LETTERS on your Answer Sheet.
The exercise begins with two examples(0 and 00).
What Is a Project Coordinator?
0 A project coordinator is an administrative professional who assists on a project that is usually
00 outsourced on to a client/contractor basis. Projects that are outsourced will often require a
【M1】project coordinator who is assists the client and another separate project coordinator who
【M2】assists the contractor. In this case, both coordinators work in tandem to ensure smooth
【M3】communication between both sides of the project team. Project coordinators never juggle a
【M4】combination of responsibilities, including on communication and schedule management,
【M5】coordinating meeting materials, and assisting in project team members with transportation or
【M6】relocation if necessary. As for most projects involve the collaboration of two or more
【M7】separate organisations, one of the ever most vital coordinator qualifications is strong
【M8】with communication skills. A project coordinator will often be called upon to confirm certain
【M9】deliverables with the client or this contractor, in order to ensure that the project is not
【M10】impeded by communication mix-ups. The coordinator will be expected to actually
【M11】communicate clearly and professionally by email, phone, and other media to ensure that
【M12】project members are total all on the same page and working as efficiently as possible. [br] 【M10】
选项
答案
ACTUALLY
解析
be expected to do意为“被期望做某事”,修饰动词的副词应放在do的后面,且ACTUALLY与此处语义不符,故多余。
转载请注明原文地址:https://tihaiku.com/zcyy/4081016.html
相关试题推荐
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutcrisismanagement.Choosethebestwordto
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
Readthearticlebelowaboutaninnovativestrategyinbusiness,andtheque
随机试题
Itisallverywelltoblametrafficjams,thecostofpetrolandthequick
Howmanychildrenunderfour"drawneachyearintheUnitedStates?______.[o
钢丝涂塑层厚度为0.25~0.38mm,钢丝直径越粗,其涂塑层越薄。()
确定水利工程大坝等别的因素有( )。[2020年湖北真题]A.工程规模 B.
全口义齿初戴时,下列哪项不是选磨的主要原因A.垂直距离一般均过高 B.架不可能
德育过程是组织学生的活动和交往,统一多方面教育影响的过程。()
Thechangeinthatvillagewasmiraculou
人在每一瞬间,将心理活动选择了某些对象而忽略了另一些对象。这一特点指的是注意的(
某公司进口一批货物100箱,经海运到达上海港,原报CFR总金额20000美元,投
下列关于建筑工程施工图预算审查方法,说法错误的是()。A.采用筛选审查法审查时,
最新回复
(
0
)