首页
登录
职称英语
How many are there quality control inspection points? [br] [originaltext]Part F
How many are there quality control inspection points? [br] [originaltext]Part F
游客
2025-05-16
9
管理
问题
How many are there quality control inspection points? [br]
Part Four. Questions 23 to 30.
You will hear a conversation about quality control.
For each question 23-30 , mark one letter (A, B or C) for the correct answer.
After you have listened once , replay the recording.
You now have 45 seconds to read through the questions.
[pause]
Now listen , mark A , B, or C.
M: Could you tell me a bit about quality control at the factory?
W: Well, there are four main quality control inspection points. We begin by visiting our suppliers to make sure we are happy with their quality control. Next, we inspect all goods on arrival at our factory and the third inspection point is during production. And the last stage is chemical analysis of our finished goods.
M: And what do you look for at each of the four inspection points?
W: Well each stage is different. With our suppliers, for instance, we inspect their quality control processes and, even more importantly, their factory hygiene. If we’re not happy with their hygiene, we’ll cancel the supply contract. As the goods is in stage, we make sure that order quantities are correct and the quality is OK. We also check the transport packaging. If the packing is damaged, the warehouse shelf-life can be reduced.
M: And what quality checks do you run during production?
W: We take samples to check there isn’t too much cooking oil on the snack and that each snack has the minimum amount of flavouring. We also check the size of the snacks and their crispness. If the snacks are too oily, they go soft.
M: So that leaves the finished goods. What do you check for at the final quality control stage?
W: We check individual bags to make sure that the packet weight is above the acceptable minimum and that the packet is sealed properly. We also check the taste.
M: And how do you do that?
W: Well, we eat them. How else? We also do chemical analysis to check things like fat levels and other information that we have to put on the packets.
[pause]
Now listen to the recording again.
[pause]
That is the end of Part Four. You now have ten minutes to transfer your answers to your Answer Sheet.
[pause]
选项
A、quality control process.
B、hygiene.
C、quality control process and hygiene.
答案
C
解析
文中提到如果suppliers的QC,process和hygiene(卫生)不符合我们的要求,我们将取消供应合同。故选C。
转载请注明原文地址:https://tihaiku.com/zcyy/4078360.html
相关试题推荐
Howmanyaretherequalitycontrolinspectionpoints?[br][originaltext]PartF
Howmanyaretherequalitycontrolinspectionpoints?[br][originaltext]PartF
Whatistheman’stitle?[br][originaltext]PartOne.Questions1to8.Forque
Whatistheman’stitle?[br][originaltext]PartOne.Questions1to8.Forque
Whatistheman’stitle?[br][originaltext]PartOne.Questions1to8.Forque
Whatistheman’stitle?[br][originaltext]PartOne.Questions1to8.Forque
Whatistheman’stitle?[originaltext]PartOne.Questions1to8.Forquestions
Themeetingisbeingheldtodiscuss______.[br][originaltext]NFC=NationalF
Themeetingisbeingheldtodiscuss______.[br][originaltext]NFC=NationalF
Themeetingisbeingheldtodiscuss______.[br][originaltext]NFC=NationalF
随机试题
MostanimalsseekshadewhentemperaturesintheSaharaDesertsoarto120d
Adultswhohadbeenfedplentyoffruitwhentheywerechildrenarelesslik
若一个多边形的内角和等于720°,则这个多边形的边数是( )。A.5 B.6
患者男,51岁。食管癌,进食困难3个月。患者乏力、极度口渴、尿少色深。查体:体温
对于拟建工程初步设计与已完工程或在建工程的设计相类似且没有概算指标,但必须对建筑
主管部门收到竣工财务决算报告后,对于按规定由主管部门审批的项目,应及时审核批复,
Ihavebeentryingtoquitsmoking.A:giv
Thechangeinthatvillagewasmiraculou
D左边四个图形可以拼合成如下图形:
费隆提出的期望理论公式为()。 A.M=VXEB.V=MXEC.E=
最新回复
(
0
)