首页
登录
职称英语
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretc
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretc
游客
2025-04-22
20
管理
问题
The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northern most state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely operate.
The steel pipe cresses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels of crude oil can be pumped through it daily.
Resting on H-shaped steel racks called "bents," long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline’s up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permanently frozen ground. A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere form 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.
One of tile largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagements and even theft the Alaska pipeline has been completed and is operating. [br] The author mentions all of the following as important in determining the pipeline’s route EXCEPT the ______.
选项
A、climate
B、lay of the land itself
C、local vegetation
D、kind of soil and rock
答案
C
解析
从文中内容可知,在决定管道路线时,只有C项不是重要因素。
转载请注明原文地址:https://tihaiku.com/zcyy/4048168.html
相关试题推荐
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretc
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretc
TheAlaskapipelinestartsatthefrozenedgeoftheArcticOcean.Itstretc
Allthemusicinstrumentsintheorchestrawillbe______beforeitstarts.A、civ
InEngland,alongastretchofthenorth-eastcoastwhichgentlycurvesfrom
InEngland,alongastretchofthenorth-eastcoastwhichgentlycurvesfrom
InEngland,alongastretchofthenorth-eastcoastwhichgentlycurvesfrom
InEnglandalongastretchofthenorth-easecoastwhichgentlycurvesfrom
JoeCoyneslidesintothedriver’sseat,startsupthecarandheadstotown
JoeCoyneslidesintothedriver’sseat,startsupthecarandheadstotown
随机试题
Theworld’sfirstinstitutionofitskindwasfoundedin1753,basedon
Whileitisdifficultforsomepeopletochangeunhealthyhabits,thereare_____
预作用式细水雾灭火系统的工作原理说法不正确的是:()。A.发生火灾时,与喷头一
A.知母 B.石膏 C.栀子 D.芦根 E.玄参具有清热止呕功效,治疗胃
患者女性,因面色苍白、疲乏无力、厌食、消化不良、舌痛、舌乳头萎缩就诊,外周血呈大
各种运输方式内外部的各个方面的构成和联系,就是( )。 A.运输系统
在我国城乡规划法律法规体系的构成中,()是政府部门针对城乡规划开展过程中为有
组织职业生涯管理要达到全面评价原则,必须由()对职业生涯进行全面评价。A.组织
某企业拟进行一项投资,有甲、乙两个投资方案,设备的使用期均为3年,资本成本率为1
剪板机、曲柄压力机、液压机都是容易发生机械伤害的设备,伤害程度与运动部件速度、加
最新回复
(
0
)