首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2025-03-03
6
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Old City Hall was constructed in ______years.
选项
A、3
B、7
C、9
D、11
答案
D
解析
细节题。定位到文章第三段第一句“Lennox took three years to design the City Hall and it took 11 years to build it.”可知,Lennox花了三年时间设计了市政厅,花了11年时间才建成,即市政厅的建设周期长达11年。故选D。
转载请注明原文地址:https://tihaiku.com/zcyy/3981367.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
W:Operator,Iwanttomakeaperson-to-personcalltoToronto,Canada.Thenumbe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
Myfatherwasaforemanofasugar-caneplantationinRioPiedras,PuertoRi
WhichoneisNOTtrueaboutthebigfire?[originaltext]Thefirefightersha
Readcarefullythefollowingexcerpt,andthenwriteyourresponseinNOLESS
Manypeoplewholiveincitiessaythattheydislikecitylife.Theysaythe
[originaltext]W:Howdidyourinterviewgo?M:Icouldn’tfeelbetteraboutit.
Morethanfortythousandreaderstolduswhattheylookedforinclosefrien
承租人甲想要购买其租用的相机,遂与出租人乙订立买卖合同,由于甲已占有该相机,为
非结算会员的结算准备金余额低于规定或者约定最低余额的,未在结算协议约定的时间内追
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
(2017年真题)根据《全国生态环境保护纲要》,需要建立生态功能保护区的重要生态
最新回复
(
0
)