首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2025-03-03
38
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $ 3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。定位到文章第二段第五句“They also say the pipeline could pollute their main water source,the Missouri River.”可知,他们认为这条管道可能会污染当地的主要水源——密苏里河,所以印第安人反对管道建设的一个原因是担心管道会污染水源一。A选项“因为工程耗资达38亿”,不是印第安人抗议的原因;C选项“因为很多人会因此而失业”和D选项“这将迫使很多人离开家园”均未在文中提及。故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3981358.html
相关试题推荐
He______havecompletedhiswork;otherwise,hewouldn’tbeenjoyinghimselfby
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
随机试题
ThePetronasTwinTowersinKualaLumpurinMalaysiawerecompletedin1998.
ASports体育运动Manyanimalsengageinplay,butho
Accordingtothetalk,compulsivegamblingandalcoholicaddictionsharesimilar
Mostofusspendourlivesseekingthenaturalworld.Tothis【C1】______wego
有关互联网药品交易服务,下列说法错误的是A.互联网药品交易服务包括直接接触药品的
()不属于项目干系人管理的输入。A.干系人管理计划 B.干系人沟通需求 C
女性,32岁。因劳力性心慌、气急3年,体检确诊为风湿性心脏瓣膜病,超声心动图显示
妊娠合并风心病,早期心衰的可靠诊断依据:A、肺底部持续湿罗音 B、心尖部闻及二
下列选项中,表示基差走弱的有( )。A.7月份时大商所豆油9月份合约基差为4元/
抽样调查中,调查的具体实施是针对()而言的。A.总体 B.样本 C.抽样框
最新回复
(
0
)