首页
登录
职称英语
A curve is a line ______ no part is straight and which has no angle.A、thatB、who
A curve is a line ______ no part is straight and which has no angle.A、thatB、who
游客
2025-03-02
17
管理
问题
A curve is a line ______ no part is straight and which has no angle.
选项
A、that
B、whose
C、in which
D、of which
答案
D
解析
“介词+关系代词”可引导定语从句。因为句中有短语“no part is straight”,因此用of which,而不用in which。whose和that在此都不符合语法结构。
转载请注明原文地址:https://tihaiku.com/zcyy/3979946.html
相关试题推荐
Acurveisaline______nopartisstraightandwhichhasnoangle.A、thatB、who
______tiredafterahardwork,shefellintobedandwentstraighttosleep.A、F
()tiredafterahardwork,shefellintobedandwentstraighttosleep.A、Felt
Whenthesuspectappearedincourt,thejudgecasta______lookathim.A、straight
Acurveisaline______nopartisstraightandwhichhasnoangle.A、thatB、whose
Whenacertainstretchofhighwaywasrebuiltandstraightened,thedistancealon
Agardenerwishestoplant5bushesinastraightrow.Eachbushhasflowersof
CityYhasinstalled30parkingmetersat15-footintervalsalongastraightstr
Twocarsstartedfromthesamepointandtraveledonastraightcourseinopposi
Twocarsstartedfromthesamepointandtraveledonastraightcourseinopposi
随机试题
A—acceptancelettersJ—referencelettersB—adjustmentlettersK—salesletters
Thee-scoreisaconsumerratingmetricusedtodetermineanindividual’spo
INSEARCHOFTHEHOLYGRAILIthasbeencalledtheHolyGrail
简述旅游的社会属性
暖风机的送风温度为()。A.25-30℃ B.35-45℃ C.35-5
水质分析的一般检验项目中,有些项目要求尽快分析,有些项目要求在4小时内测定。下列
工程费用的动态监控中常用的偏差分析方法包括()。A:横道图法 B:时标网络图
旅游安全风险提示为一级的,用蓝色标示。
创设环境时,______是依据,应把______落实到月计划、周计划、日计划及其
关于施工阶段特点的说法,错误的是()。A、施工阶段是影响建设工程投资的关键阶段
最新回复
(
0
)