首页
登录
职称英语
71. There was a big pile of bricks on the top of a tall building and a man h
71. There was a big pile of bricks on the top of a tall building and a man h
游客
2025-03-02
9
管理
问题
71.
There was a big pile of bricks on the top of a tall building and a man had to bring them down to the ground.
He had a long rope which went over a pulley(滑轮)at the roof of the building. The other end was fastened to a big box.
First he pulled the box up to the top of the building, and fastened the end of the rope so that the box could not come down. Then he climbed up the ladder and filled the box with bricks. Next he climbed down the ladder and untied the rope. Unfortunately the box of bricks was heavier than the man, and as a result he was pulled up by the rope. Half - way up, the box of bricks hit him as it was coming down.
When he reached the top, his head hit the pulley. The box of bricks hit the ground and broke. As a result the bricks fell out. The box was then lighter than the man and consequently he began to come down and the box began to go up.
Half-way up, the box hit the man. The man still held on to the rope and the box therefore continued to go up. The man then reached the ground. Then he let go the rope to rub his head. The box, of course, then fell down and hit the man on the head again. As a result, an ambulance came and took him to hospital. [br] Why did the man fasten the end of the rope before he climbed up the ladder?
选项
A、He was afraid that someone would steal his box.
B、Because he wanted to climb up along the rope.
C、He fastened the end of the rope in order to keep the box unmoved.
D、Because he wanted to prevent the box from coming down.
答案
D
解析
此题为细节题。见文章的第二段第一行“fastened the end of the rope so that the boxcould not come down。”
转载请注明原文地址:https://tihaiku.com/zcyy/3979269.html
相关试题推荐
Alltheirattemptsto_________thechildfromtheburningbuildingwereinvain
Therewasabigpileofbricksonthetopofatallbuildingandamanhadtobr
Itmayalsoseverelylimitactivitiessuchaslogging,road-building,andhuntin
Thebuilding______mostlyundamagedaftertheearthquake,andonlyminorrepair
71.Therewasabigpileofbricksonthetopofatallbuildingandamanh
71.Therewasabigpileofbricksonthetopofatallbuildingandamanh
Beforebuildingahouse,youwillhaveto______thegovernment’spermission.A、g
SpeakerA:DoyoumindifIkeeppetsinthisbuilding?SpeakerB:______A、Whok
Theyarebuildingthedamin______withanotherfirm.A、associationB、comparisonC
Atnotime______inthewholebuilding.A、smokingispermittedB、smokingbepermit
随机试题
[img]2015m7x/ct_egreqm_egreqjs_0013_20153[/img]Thetableaboveshowsthefreque
(1)Historyisriddledwithsciencedenial.FromNewton’slawofgravitation
[originaltext]M:Jane,I’mhavingdifficultywithallthetheoreticstuffwear
Somesayitisevidentthatcomputerscandamageaperson’seyesight.Since
工程量清单的作用包括()。A.在招投标阶段,招标工程量清单为投标人的投标竞
对于麻疹初期的咳嗽,不宜用A、有刺激性的化痰药 B、药性寒凉的化痰药 C、清
主动脉瓣关闭不全的舒张期杂音A.坐位稍前倾时明显 B.仰卧位深吸气时明显 C
公路工程交工验收必须具备的条件有()。A.合同约定的各项内容已完成,各方就合同
下列关于杜邦分析体系的说法中,不正确的是()。A.杜邦分析体系以净资产收益率为起
甲公司投资的某公建项目招标,乙公司以8200万工程报价中标,甲、乙双方按中标价签
最新回复
(
0
)