首页
登录
职称英语
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2025-03-01
20
管理
问题
Toronto’ s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch, and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the " Friends of Old City Hall. "
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
The entire structure cost more than $ 2.5 million to build at the time. This is equal to $ 53 million today. [br] Toronto’ s third City Hall came into use in______.
选项
A、the 18th century
B、the 19th century
C、the 20th century
D、the 21st century
答案
B
解析
细节题。定位到文章第一段可知,多伦多第三市政厅于1899年9月18日开放,即市政厅是在1899年投入使用的。1899年属于19世纪,故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3977376.html
相关试题推荐
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthe
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
随机试题
Theoldmanwasremarkably______.Hewasamusician,engineer,writerandphilos
InterviewTipsforCollegeStudentsMostofthestudents
Gotapenhandy?Tobestestimateyourstart-upcosts,you’llneedtomakea
[originaltext]Ateverystageofourliveswemakedecisionsthatwillprofo
Imagine19,500homespoweredexclusivelybythesum,andnoneofthemwithso
"LostCity"ExploredUsingHigh-SpeedNetworksUnderseaexplora
雨季雨水可能侵入矿区矿井下时,应根据具体情况,采取下列措施错误的是()A.应设
山东省属于少数民族杂居、散居省份,共有()个少数民族。A.51 B.53 C
在项目目标动态控制的纠偏措施中,调整管理职能分工属于( )。A.组织措施 B
关于施工企业资质管理制度,说法正确的是()。A.建筑业企业增项申请资质,应当按
最新回复
(
0
)