首页
登录
职称英语
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
游客
2025-02-25
24
管理
问题
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineering proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and
act as a buffer, so that it absorbs
the energy of crashing waves and protecting the beaches.
选项
A、act as a buffer, so that it absorbs
B、act like a buffer so as to absorb
C、act as a buffer, absorbing
D、acting as a buffer, absorbing
E、acting like a buffer, absorb
答案
C
解析
本句展示了and的判定意义。第一个and表明act应与rise并列,而不是与building并列,排除D、E;第二个and表明absorb应与protect形式一致,由此选C。absorbing与protecting并列作rise和act的伴随结果。此句中的parallel to shore修饰a breakwater,由于a breakwater后还有定语从句修饰,所以把parallel to shore前置。
转载请注明原文地址:https://tihaiku.com/zcyy/3972659.html
相关试题推荐
Inastudyofmorethan8,000peopleusingtenbeachesontwooftheGreatLakes
Thenumberofundergraduatedegreesinengineeringawardedbycollegesandunive
InaplantostoptheerosionofEastCoastbeaches,theArmyCropsofEngineeri
Usingthetechniquesemployedbygeneticengineering,anewspeciesofmicroorga
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:ironE、piece
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:iron
Consumersmaythinkthatgeneticengineeringoffoodsissomethingnew,buthuma
The______ofimpactcratersonVenussuggeststhaterosionmayhavesmoothedits
随机试题
PROVIDENT:A、manifestB、prodigalC、thankfulD、tidyE、refutedB
施工项目管理组织,是指为进行施工项目管理、实现组织职能而进行组织系统的()三个
B对等式两边同时取微分得:2xdx+2ydy+2zdz=4dz。所以,
双壁波纹管静摩擦系数要求≤0.55。()
银行的存贷款业务应归人( )账户。A.基本 B.银行 C.交易 D.封闭
正常骨盆的形状是A:骨盆的入口平面和中骨盆平面呈横椭圆形,出口平面呈纵椭圆形
鉴真
以下只被当作整理形态的是( )。A:旗形 B:楔形 C:上升三角形 D:下
商业银行向客户提供的财务分析与规划、投资建议、个人投资产品推介等专业化服务是()
应用于道路运输系统的(),可以为用户提供实时的三维位置和三维速度等相关数据。A:
最新回复
(
0
)