首页
登录
职称英语
Complete the notes below.Write ONE WORD AND/OR A NUMBER for each answer.
Complete the notes below.Write ONE WORD AND/OR A NUMBER for each answer.
游客
2025-02-13
19
管理
问题
Complete the notes below.
Write ONE WORD AND/OR A NUMBER for each answer.
The Underground House
Design
Built in the earth, with two floors
The south-facing side was constructed of two layers of【L33】______
Photovoltaic tiles were attached
A layer of foam was used to improve the【L34】______of the building
Special features
To increase the light, the building has many internal mirrors and
【L35】______
In future, the house may produce more【L36】______than it needs
Recycled wood was used for the【L37】______of the house
The system for processing domestic【L38】______is organic
Environmental issues
The use of large quantities of【L39】______in construction was
environmentally harmful
But the house will have paid its ’environmental debt’ within【L40】______ [br] 【L38】
选项
答案
waste
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3954513.html
相关试题推荐
Completethenotesbelow.WriteNOMORETHANTWOWORDSforeachanswer.
Completethenotesbelow.WriteNOMORETHANTWOWORDSforeachanswer.
Completethenotesbelow.WriteNOMORETHANTWOWORDSforeachanswer.
Completethenotesbelow.WriteONEWORDONLYforeachanswer.Notes
Completethenotesbelow.WriteONEWORDONLYforeachanswer.Notes
Completethenotesbelow.WriteONEWORDONLYforeachanswer.Notes
Completetheformbelow.WriteONEWORDAND/ORANUMBERforeachanswer.
Completetheformbelow.WriteONEWORDAND/ORANUMBERforeachanswer.
Completetheformbelow.WriteONEWORDAND/ORANUMBERforeachanswer.
Completethenotesbelow.WriteONEWORDONLYforeachanswer.Hydropowe
随机试题
SpeakerA:Goodevening,sirandmadam.SpeakerB:Goodevening.【D1】______Spea
Whichofthefollowingisthemaincauseofhighfoodprices?[originaltext]
______isnotasuprasegmentalfeature.A、AspirationB、IntonationC、StressD、Tone
我国规定的标准大气条件是()。
三级安全教育是指()。A.企业法定代表人、项目负责人、班组长 B.公司、项目
下列工程施工过程中,属于侵权行为的情形有( )。A.工地的起重机倒塌造成行人黄
有关异位妊娠,哪项是正确的A.均有停经史 B.尿妊娠试验阴性,可排除异位妊娠
本周蛋白检测时应考虑到A:化学法操作烦琐,技术要求高B:血标本的检m率不如尿标
关于微量元素说法错误的是A:微量元素对人体可分成必需、无害和有害三类B:必需微
仪表管道安装施工程序中,阀门压力试验的前一步工作是()。A.管路预制、安装
最新回复
(
0
)