首页
登录
职称英语
A system was developed to control traffic congestion on the M25 motorway. Expert
A system was developed to control traffic congestion on the M25 motorway. Expert
游客
2025-02-10
1
管理
问题
A system was developed to control traffic congestion on the M25 motorway. Experts use【L5】________information from the motorway to set【L6】________according to traffic build-up. However, in order to maintain a steady flow of traffic, the number of vehicles on the roads should not exceed【L7】________per lane per hour, which is far fewer than the number on【L8】________of the motorway. One solution could be to fit the car with【L9】________and a computer. The system would be activated when approaching an area of congestion and the computer would then regulate the acceleration and【L10】________to help the car to pass easily through the congestion. [br] 【L9】
A: So they’re looking at live action on the motorway?
D: Exactly. Because they’re working in real time and reacting immediately to the situation on the road, they hope to alleviate problems before they happen. So as the traffic gets heavier to the point where these waves of congestion are likely to form, the controllers monitoring the situation set speed limits at say, 50 or 60 mph to regulate the flow. Further back down the motorway at the back of the congestion zone, they set a lower speed limit, say 40 mph, which should theoretically help control the traffic through the problem area.
A: But traffic jams still happen on the M25, don’t they? I was in one a few months ago and we were at a standstill for ages.
D: Yes, of course, sometimes there are simply too many cars on the roads, I think what the programme said was that the ideal number of cars on the road is
no more than 2,000 per lane per hour
— something like that. Theoretically, this should keep traffic moving smoothly at all times. But of course the number of cars on the road
far exceeds this
— I think in
some sections of the M25
there have been up to 200,000 vehicles a day.
A: Mmm. So, basically we need to reduce the number of cars on the roads. Well, that’s not likely to happen, is it?
D: No, but researchers are still looking into car technology that might help. As most congestion waves are caused by drivers braking too hard suddenly, the idea is that you
install radar on the outside of the car
and an onboard computer. The driver would activate the system when signs alerted him or her to a possible congestion zone. Then the computer would take over and then
take control of the braking and acceleration.
Because it can react much faster than a human driver, in theory, it would control the car smoothly through the zone.
A: A bit like an auto-pilot system?
D: Yes.
选项
答案
radar
解析
本题有关研究者对缓解交通拥堵的想法。录音原文中的install是题目中fit的同义替换,表示“安装”。
转载请注明原文地址:https://tihaiku.com/zcyy/3951157.html
相关试题推荐
AsystemwasdevelopedtocontroltrafficcongestionontheM25motorway.Expert
AsystemwasdevelopedtocontroltrafficcongestionontheM25motorway.Expert
AsystemwasdevelopedtocontroltrafficcongestionontheM25motorway.Expert
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
[img]2022m3x/ct_ve01202001m_eillist_1293_220329[/img][br]temperaturecontrol[
Duringthenineteenthcenturythemoleculartheoryofmatterwasdeveloped,(whi
随机试题
Overthepastdecade,Americancompanieshavetriedhardtofindwaystodis
Thereare(differ)______betweenthetwosimilarpictures.differencestherebe句型可
一种学习对另一种学习的影响,称为学习的( )。A.强化 B.反馈 C.联结
施工单位安全资料管理职责包括()。A.逐级建立安全资料管理岗位责任制,明确责任部
MVC模式(模型-视图-控制器)是软件工程中的一种软件架构模式,把软件系统分为模
规范金融机构资产管理业务主要遵循()原则。 ①大致把控风险的思维.
关于血肌酐和尿素叙述错误的是A.尿素的浓度取决于机体氮的分解代谢和肾脏的排泄能力
某男性患者,35岁。缺失1年求修复。口腔余牙均健康。关系正常。预行固定义齿修复
根据《文物保护法》,属于受国家保护的文物的是( )。A.历史事件有关的史迹 B
男52岁,1周来出现阵发性夜间心前区闷胀,伴出汗,每次持续约10分钟,能自行缓解
最新回复
(
0
)