首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
游客
2025-02-07
3
管理
问题
Art Murals
[br] Why does the instructor say this:
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、To explain how a wall can be made stronger
B、To describe the process of framing a mural
C、To explain how to create an insulating air space
D、To describe a technique for texturing a plaster wall
答案
C
解析
Why does the instructor say this:
"Now, to do this—it’s called "furring" the wail—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this."
The instructor’s purpose is to explain how to create an insulating air space between the outer and inner walls. The instructor describes how to build another wall on top (?[strips of wood attached to the inside surface of the wall. The mural will be painted on this new wall. (2.3)
转载请注明原文地址:https://tihaiku.com/zcyy/3946736.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Iseachofthesetrueabo
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Howistheinformationin
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Arethesestatementstrue
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whyarescientistsunsure
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoefspeakc_0087_20124[/img][originaltext]Whatisstr
[img]2012q2/ct_etoefm_etoefspeakc_0084_20124[/img][originaltext]PhelixOhmyG
随机试题
Youshouldspendabout20minutesonQuestions27-40whicharebasedonReading
Twosubstituteswereusedduringthecriticalbasketballgamelastnight.A、playe
全过程工程咨询服务不包含( )。A.勘察 B.设计 C.施工 D.监理
某公司去年股东自由现金FCFE为100万元,预计今年增长2%。公司现有200万股
卡托普利的降压作用是A、阻断β受体 B、拮抗钙通道 C、利尿降压 D、直接
本规定对变电运维工作的运维班管理、生产准备、运行规程管理、设备巡视、倒闸操作、故
从所给的四个选项中,选择最合适的一个填入问号处,使之呈现一定的规律性:
教师职业道德评价的原则包括() A.方向性原则 B.客观性原则 C.科学性
钢结构用水性防腐涂料产品,不包括( )。A.底漆 B.色漆 C.面漆 D
重力坝按坝体高度分为高坝、中坝和低坝,其中高坝的高度不低于( )。A.40m
最新回复
(
0
)