首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] What is the pur
游客
2025-02-07
30
管理
问题
Art Murals
[br] What is the purpose of having an air space between the outer wall and the plaster?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、It will protect the plaster from temperature changes.
B、It will give the mural a greater sense of depth.
C、It will reduce the time needed for drying the plaster.
D、It will eliminate the need to wash the wall frequently.
答案
A
解析
The student says We could create an air space between the outer wall of the building and the plaster; The air space would have an insulating effect. What 1 mean is’, it would slow down any temperature changes on the plaster. (2.2)
转载请注明原文地址:https://tihaiku.com/zcyy/3946735.html
相关试题推荐
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0615_20124[/img][br]Whatisstatedinthelec
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Arethesestatementstrue
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoeflistz_0608_20124[/img][br]Whatisthetopicofthe
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Whydoestheprofessorsa
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Iseachofthesetrueabo
[img]2012q2/ct_etoefm_etoeflistz_0588_20124[/img][br]Accordingtotheprofesso
[img]2012q2/ct_etoefm_etoefspeakc_0087_20124[/img][originaltext]Whatisstr
随机试题
[A]enormously[I]abolish[B]occupy[J]role[C]ambiguous[K]underreprese
灵感是指在文学、艺术、科学、技术等活动中,由于艰苦学习、长期实践,不断积累经验和
A.湿毒蕴结 B.阴虚火旺 C.湿浊内阻 D.肝经湿热 E.气阴两虚非淋
关于货币市场基金的说法,不正确的是()。A、最近7日年化收益率是收益分析的重要
下面属于政策性银行发行金融债券应向人民银行报送的文件的是()。 ①金融债券发
静脉注射的缩写是A.i.m. B.i.d. C.i.h. D.p.o.
水面:镜子 A毛笔:钢笔 B藤条:绳子 C图画:照片 D火把:电灯
消防用电设备供电线路在电缆隧道、电缆桥架、电缆竖井、封闭式母线、线槽安装等处时,
企业实施合并重组,采用企业所得税一般性税务处理方法时,下列处理正确的有()
稀浆罩面施工质量验收的主控项目有( )。A.抗滑性能 B.渗水系数 C.厚
最新回复
(
0
)