首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2025-01-26
38
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Developing countries have developed sensor networks for flooding with real-time automated capacity.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…do not exist in a real-time automated capacity within developing countries”判断,本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3929716.html
相关试题推荐
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
Becauseitisnotaseriousproblem,wearenotnecessarytotakestrictmeasure
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
随机试题
金融期货最早产生于()年。A、1968B、1970C、1972D、1982C1972年5月16日,芝加哥商业交易所(CME)的国际货币市场分部(
AccordingtoDeirdreImus,whyisitimportanttoraisegreenkids?[br][origi
ThenovelTheAdventuresofHuckleberryFinnwaswrittenbyA、HenryJames.B、O.H
BigBlundersfromBigBusinessesInternatio
一质点作匀加速直线运动,在t(s)时间内走过路程s(m),而其速度增为初速的n倍
A.脑脊液标本,静置12~24小时后形成纤维丝状或挂漏斗状薄膜B.脑脊液呈标本,
A.<20% B.20%左右 C.20~40% D.>40% E.50%
患者王某,既往有肝硬化病史10余年,近二月来感腹胀明显,心慌、气短,呼吸困难,查
下列市场环境中,属于宏观环境的有()。A.经济与技术环境 B.政治与法律
影响核酸生物合成的抗肿瘤药物是A.羟基脲 B.马利兰 C.环磷酰胺 D.6
最新回复
(
0
)