首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2025-01-26
25
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Developing countries have developed sensor networks for flooding with real-time automated capacity.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
B
解析
根据原文“…do not exist in a real-time automated capacity within developing countries”判断,本题表述错误。
转载请注明原文地址:https://tihaiku.com/zcyy/3929716.html
相关试题推荐
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Assumingthattheengineeringproblemscouldbeovercome,theproductionof
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
Becauseitisnotaseriousproblem,wearenotnecessarytotakestrictmeasure
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、fl
随机试题
TheUnitedNationsGeneralAssemblywillsetupanewagencyto[originaltext]
(1)Doppelganger,aSanFrancisco-basedstartupislaunchingavirtualworld
[originaltext]M:ThankyouforcallingOverseasTravelAgency.MayIhelpyou?
当采用S曲线比较法时,如果实际进度点位于计划S曲线的右侧,则该点与计划S曲线的垂
下列哪一个不是盐渍土所具有的特征? A.融陷B.承载力极小C.盐胀D.具
GP,孕38周,规律宫缩5小时入院。产科检查:宫口扩张3cm,胎心率140次/分
一般骨折多长时间后,X线片可见骨性愈合的征象()A.1~2个月 B.3~6
建设工程采用设计施工总承包模式的特点是( )。A.容易获得最优设计方案 B.
符合《民用建筑室内环境污染控制规范》GB50325-2010对环境污染物限量的有
(2014年真题)某公司是一家易燃化学品生产企业,同时还开设了一家经营自产产品的
最新回复
(
0
)