首页
登录
职称英语
U. S. and Europe’s approach to foreign students is to westernize them in a way o
U. S. and Europe’s approach to foreign students is to westernize them in a way o
游客
2025-01-17
20
管理
问题
U. S. and Europe’s approach to foreign students is to westernize them in a way of educating future leaders. [br]
The idea that educating future leaders from other nations will make them more Western has long guided the U. S. and Europe’s generous approach to foreign students of high and low parentage but not everyone thinks it works.
No amount of confidence changes the fact that Silicon valley’s big venture capitalists are almost entirely male. The top five don’t have any female senior partners, and VC partners are 96 percent male. Twenty years ago, the partners were 97 percent male.
选项
A、正确
B、错误
答案
B
解析
原文指出硅谷的风险投资人基本上都是男人,排在前五名的风投公司,其合作伙伴中没有年长的女性。
转载请注明原文地址:https://tihaiku.com/zcyy/3916426.html
相关试题推荐
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
U.S.andEurope’sapproachtoforeignstudentsistowesternizetheminawayo
China’scooperationwithEuropeisdrivenpredominantlybyitspartnershipwith
China’scooperationwithEuropeisdrivenpredominantlybyitspartnershipwith
[originaltext]Moreoftenthannot,I’vebeenaskedbymystudentsthisques
随机试题
(Fighting)broke(out)(between)theNorthern(states)andSouthernstates.A、Fig
[originaltext]InJanuary1989,(9)theCommunityofEuropeanRailwayspresen
Mitchellsoundsutterlyaloneinhermelancholy,turningthesadnessintotender
IrememberMaxverywell.HehadaPh.D.fromPrinceton.HewasaChaucerian
如图4为某同学设计的喷水装置,其中圆柱形容器的容积为V。,内部装置有体积为0.5
蛋白质分子中相邻的两氨基酸残基间的化学键是A.二硫键B.氢键C.酯键D.盐键E.
Thechangeinthatvillagewasmiraculou
患者,6岁,左下后牙有洞疼痛1个月,昨晚加重,不能入眠。最可能的诊断为A:深龋嵌
招标采购的货物必须符合设计文件和合同文件对货物技术性能的要求,这体现了货物招标应
EPC工程总承包方的项目管理工作涉及的阶段是()。A.决策设计一施工一动用前准
最新回复
(
0
)