What materials were not used for road surfaces during the last century? [br]
Mr. Jones: What materials were used for road surfaces during the last century?
Engineer: Usually they were gravel and macadam. Tars and asphalt were originally used only as coverings, but later they were used as binders and finally as hot mixtures.
Mr. Jones: Concrete is a modem material as far as road - building goes, isn’ t it?
Engineer: Relatively speaking. But you might be surprised to know that a concrete road was built as early as 1893 in Ohio. But it was only 5 miles long. More extensive projects were not undertaken until much later, around 1912 or 1913.
Mr. Jones: This was because of the increase in traffic?
Engineer: That’ s right. Especially in the use of heavy tracks. More rigid pavements, such as concrete and brick, became a necessity. For light traffic, though, water-bound macadam, gravel, sand clay, and bituminous mixtures were still used.
Mr. Jones: What are turnpikes usually made of?
Engineer: Turnpikes are usually made of reinforced concrete about 8 to 10 inches thick, placed on a granular sub-base, which in turn is placed on a well - tacked earth subgrade. Of course, the construction depends a lot on the local climate, rainfall, soils, and so on.
Mr. Jones: How do you mean--climate?
Engineer: Frost is one of the main problems. For example, in Maine, where frost is quite frequent, the typical turnpike construction is a thin top layer of asphaltic concrete on a base layer of sand and gravel placed on a 36 - inch, frost - free, granular subgrade.
Mr. Jones: What is the width of these roads?
Engineer: The early two - lane roads were about 20 feet wide. But with higher automobile speeds, the width requirements increased greatly. To give you an example, the Pennsylvania Turnpike has two 12 - foot lanes in each direction, separated by a median 10 feet wide. On each side there is a 10 -foot stabilized shoulder, marking a total width of 78 feet. The New Jersey Turnpike averages 100 feet in width, with three lanes in each direction.
Mr.Jones: I guess wider roads are being built every day.
Engineer: That’ s right. Sometimes you think that, no matter how good a road you build, the speed and weight of vehicles will always be one step ahead.
选项
A、Sand clay.
B、Macadam.
C、Brick.
D、Bituminous mixtur
答案
C
解析
The engineer指出:For light traffic, water-bound macadam, gravel, sand clay, and bituminous mixtures are used. "bituminous"为"like or containing any of various flammable mixtures of hydrocarbons and other substances that are constituents of asphalt and tar."含有沥青的。
转载请注明原文地址:https://tihaiku.com/zcyy/3886889.html
相关试题推荐
______istheAmericanpresidentduringTheGreatDepressionwhoproposedNewDe
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
Stupendouspriceswerepaidinahistoricsaleof19th-and20th-centuryavant-g
TheEconomicSituationofJapaninthe18thCenturyIntheeight
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
Insixteenth-centuryItalyandeighteenth-centuryFrance,waningprosperity
随机试题
Today,theworldwidewebcanbeusedbothtosearchinformationandtomak
Thejobperformanceofthenewemployeeleavesalottobedesired.Theunderlin
Earlierstudieshavetiedchronicsleepdisordersandlowlevelsofsleepto
设备、材料的采购供应中要明确监控系统设备供应商和被监控设备供应商之间的界面划分,
A.血压升高 B.血压降低 C.心动过缓 D.体温升高下丘脑紊乱()
导游人员处理漏接事故的措施包括():A:向游客赔礼道歉 B:尽量采取弥补措
原材料账面价12万元/套,市价为10万元/套。每套原材料加工成产品要花15万元,
关于IgG错误的是A、为标准的单体分子B、初次免疫应答的主要抗体C、分解慢、
患者,男,65岁,进行性吞咽困难4个月,体重下降6kg,目前能饮水和进流质饮食。
多以全心衰竭为主要表现A.急性心肌梗死 B.急性肺栓塞 C.扩张型心肌病
最新回复
(
0
)