首页
登录
职称英语
Humans are thought to be responsible for a large number of environmental pr
Humans are thought to be responsible for a large number of environmental pr
游客
2024-11-12
1
管理
问题
Humans are thought to be responsible for a large number of
environmental problems, ranging from global warming to ozone
depletion. That is not in doubt, however, is the devastating effect【S1】______
humans are having on the animals and plants of the planet.
Currently, an estimated 50,000 species become extinct each
year. If this takes on, the impact on all living creatures is likely to【S2】______
be profound. All species depend in some way each other to survive.【S3】______
If you remove one species from this very complex web of
interrelationships, you have very little idea about the knock-on
effects on the ecosystem. However, if you lose a key species, you【S4】______
might cause a whole flood of other extinctions.
The most complicating matter is the fact in that there is no【S5】______
obvious solution to the problem. Unlike global warming and ozone
depletion—which, if the political will is there, could be reduced by【S6】______
cutting gas emissions—preserving bio-diversity remains an
intractable problem.
The late idea is " sustainable management" , which involves【S7】______
using any species for human beings’ benefit, provide enough【S8】______
individuals of that species are left alive to ensure its continued
existence. Sustainable management is seen as a practical and
economic way of protecting species from extinction. Instead of【S9】______
depending on largely ineffective laws against illegal hunting, it gives
local people a good economic reason to preserve plants and animals.
This sounds like a sensible strategy, but it remains to be seen
whether it will work. With corruption popular in many developing
countries, some observers are suspicious that the money will
actually reach people it is intended for. Others wonder how effective【S10】______
the locals will be at stopping illegal hunters. [br] 【S7】
选项
答案
late—latest
解析
语义错误。此处的意思是“最新的观点是‘可持续管理’”,因此应该使用latest“最新的”,late表示“迟的,已故的”。
转载请注明原文地址:https://tihaiku.com/zcyy/3842453.html
相关试题推荐
Industrialbuyersareresponsibleforsupplyingthegoodsandservicesthatano
AnumberofyearsagoIsatdownonastonebenchoutsidetheTeatroAvenida
AnumberofyearsagoIsatdownonastonebenchoutsidetheTeatroAvenida
AnumberofyearsagoIsatdownonastonebenchoutsidetheTeatroAvenida
AnumberofyearsagoIsatdownonastonebenchoutsidetheTeatroAvenida
AnumberofyearsagoIsatdownonastonebenchoutsidetheTeatroAvenida
Overtheyears,I’veheardafairnumberofslursshoutedatcampuscops.S
Overtheyears,I’veheardafairnumberofslursshoutedatcampuscops.S
Overtheyears,I’veheardafairnumberofslursshoutedatcampuscops.S
Overtheyears,I’veheardafairnumberofslursshoutedatcampuscops.S
随机试题
Everyotherweekitseemsanewstudycomesoutthataddstoouralready-for
______thehousewillbebuiltwillbediscussedattomorrow’smeeting.A、IfB、Whe
关于下列职业病与特殊效应指标配对错误的是B.急性一氧化碳中毒--血红蛋白破坏
下列哪一内分泌腺分泌的激素可使血钙升高?A.甲状腺 B.甲状旁腺 C.肾上腺
下列情况可引起框移突变的是DNA链中 A.A转换为GB.A的缺失 C.
某女40岁按甘草附子汤的组方取药,药师嘱其所用制附子应先煎之后与他药共煎。制附子
立法阶段的准备包括()。A.立法预测 B.法律草案的征集 C.立法规划的制
根据《全国主体功能区规划》,“限制开发”特指()A:限制高强度的土地、水资源开发
(2017年真题)项目监理机构对工程施工质量实施控制的主要依据有( )。A.工程
建设工程项目进度计划系统是由多个相互关联的进度计划组成的系统,这是( )的依据。
最新回复
(
0
)