首页
登录
职称英语
Why was Windsor town blocked? [originaltext] Windsor town center was blocked
Why was Windsor town blocked? [originaltext] Windsor town center was blocked
游客
2024-10-30
38
管理
问题
Why was Windsor town blocked?
Windsor town center was blocked as hundreds of young people skirmished with police who earlier had broken up a pop music festival in Windsor Great Park. Police said last night that 220 people had been arrested during the day, most of them in the park during the eviction operation. Thirty-six people were injured, 21 of them police officers. A woman police officer had a broken arm and one policeman was in Wexham Park Hospital, near Windsor, with chest injuries. Most of those arrested are accused of drug offences or of obstruction.
选项
A、Young people skirmished with the police.
B、There was a pop music festival in the park.
C、Policemen were injured in an accident in the street.
D、There was no hospital in the town.
答案
A
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3823127.html
相关试题推荐
Thespeakerlikesteachingbecauseof______.[br][originaltext]Ihavetoteach
Thespeakerlikesteachingbecauseof______.[br][originaltext]Ihavetoteach
Thespeakerlikesteachingbecauseof______.[br][originaltext]Ihavetoteach
Thespeakerlikesteachingbecauseof______.[br][originaltext]Ihavetoteach
Thespeakerlikesteachingbecauseof______.[br][originaltext]Ihavetoteach
Thespeakerlikesteachingbecauseof______.[originaltext]Ihavetoteachthes
Whatdoesthespeakermean?[br][originaltext]Johnmetmeatthedoorandsaid
Whatdoesthespeakermean?[br][originaltext]Johnmetmeatthedoorandsaid
Whatdoesthespeakermean?[br][originaltext]Johnmetmeatthedoorandsaid
Whatdoesthespeakermean?[originaltext]Johnmetmeatthedoorandsaidhisd
随机试题
WhatisthemotherbeardoingnowinMarch?She’ssleeping.Lastautumn,
Lookatthestatementsbelowandatthefiveextractsfromanarticleaboutinve
下列哪些因素与建筑供暖供热系统的热力工况有关?()A.供热热媒温度条件 B
下列不是只属于国家所有的是( )。A.矿藏 B.无线电频谱资源 C.国防资产
与2009年相比,2013年湖北省棉花播种面积下降了约:() A.8.3%
绩效管理体系设计的前期准备工作主要有( )。A.明确企业的战略目标 B.进行
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
图4-18所示一等边三角形板,边长为a,沿三边分别作用有力F1、F2和F3,且
根据《招标投标法实施条例》,投标人认为招投标活动不符合法律法规规定的,可以自知道
应用S形曲线法进行施工成本偏差分析时,已完工作实际成本曲线与已完工作预算成本曲线
最新回复
(
0
)