首页
登录
职称英语
Design of all the new tools and implements is based on careful experiments
Design of all the new tools and implements is based on careful experiments
游客
2024-10-14
19
管理
问题
Design of all the new tools and implements is based on careful experiments with electronic instruments. First, a human "guinea pig" is tested using a 【C1】______ tool. Measurements are taken 【C2】______ the amount of work done, and the buildup of heat in the body. 【C3】______ joints and stretched muscles cannot 【C4】______ as well, it has been found, 【C5】______ joints and muscles in their 【C6】______ positions. The same person is then tested again, using a tool designed according to the suggestions made by Dr. Tichauer. All these tests have shown the great 【C7】______ of the new designs over the old.
One of the electronic instruments used by Dr. Tichauer, the myograph, 【C8】______ visible through electrical signals the work done by human muscle. Another machine 【C9】______ any dangerous features of tools, thus proving information upon 【C10】______ to base a new design. One 【C11】______ of tests made with this machine is that a tripod stepladder is more 【C12】______ and safer to use than one with four legs.
This work has 【C13】______ the attention of efficiency experts and time-and-motion-study engineer, but its value goes far 【C14】______ that. Dr. Tichauer’s first 【C15】______ is for the health of the tool user. With the 【C16】______ use of the same tool all day long on 【C17】______ lines and in other jobs, even light 【C18】______ work can put a heavy stress on one small area of the body. In time, such stress can cause a disabling disease. 【C19】______ , muscle fatigue is a serious safety 【C20】______ . [br] 【C18】
选项
A、hand
B、labor
C、manual
D、mind
答案
C
解析
篇章逻辑题之篇章语义。此处所指的工作应该同前文提到生产线上的工作类似,所以排除选项D,而labor不能跟work连用,所以排除选项B。这里并不具体指某种劳动,所以用 manual work(体力劳动)。
转载请注明原文地址:https://tihaiku.com/zcyy/3801515.html
相关试题推荐
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
Designofallthenewtoolsandimplementsisbasedoncarefulexperiments
随机试题
某输水涵洞工程,发包人和承包人按照《水利水电工程标淮施工招标文件(2009年版)
下列有关投资性房地产会计处理的表述中,正确的有()。A.满足特定条件时可以采用
财务分析方法中最常用的一种是结构分析法。( )
理财规划师在对客户进行纳税筹划时,应注意纳税筹划的风险,下列不属于纳税筹划风险的
()是上课的必要补充,是适应学生个别差异,贯彻因材施教的重要措施。 A.
使用期货投资者保障基金前,中国证监会和保障基金管理机构应当监督期货公司核实投资者
A.单硝酸异山梨酯 B.可乐定 C.阿托伐他汀 D.非洛地平 E.雷米普
科学合理的合同管理制度为建筑企业内部管理机构和人员提供()。A:责任体系 B:
建设工程组织流水施工时,用来表达流水施工在空间布置上开展状态的参数有( )。A
下列控制措施中,属于工程项目目标被动控制措施的是()。A.制订实施计划时,
最新回复
(
0
)