首页
登录
职称英语
The normal human daily cycle of activity is some 7-8 hours’ sleep alternatio
The normal human daily cycle of activity is some 7-8 hours’ sleep alternatio
游客
2024-10-07
36
管理
问题
The normal human daily cycle of activity is some 7-8 hours’ sleep alternation with some 16-17 hours’ wakefulness and that the sleep normally coincides(1)_____ the hours of darkness. Our present concern is how easily and to what extent this(2)_____ can be modified.
The question is not merely an academic one. The ease with which people can change from working in the day to working at night is a(3)_____ of growing importance in industry where automation (4)_____ round-the-clock working of machines. It normally(5)_____ from five days to one week for a person to adapt to a(6)_____ routine of sleep and wakefulness,(7)_____ during the day and working at night.(8)_____, it is often the case in industry that shifts are changed every week. This (9)_____ that no sooner has he got used to one routine(10)_____ he has to change to another, (11)_____ much of his time is spent neither working nor sleeping very(12)_____.
One answer would seem to be(13)_____ periods on each shift, a month, or(14)_____ three months.(15)______, recent research has shown (16)_____ people on such systems will go back to their(17)_____ habits of sleep and wakefulness during the weekend and that this is quite enough to destroy any(18)_____ to night work built up during the week. The only real solution appears to be to(19)_____ the night shift to those permanent night workers whose(20)_____ may persist through all week-ends and holidays. [br] (16)
选项
A、that
B、how
C、what
D、when
答案
A
解析
分析句子结构,空格所在处在has shown之后.因此推断为宾语从句.该从句的主谓结构完整,且为陈述句,因此选that。
转载请注明原文地址:https://tihaiku.com/zcyy/3790127.html
相关试题推荐
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
Thenormalhumandailycycleofactivityissome7-8hours’sleepalternatio
随机试题
()是指探测火灾早期特征,发出火灾报警信号,为人员疏散、防止火灾蔓延和启动
流行性出血热治疗的关键是()A."三早一少" B.早期抗病毒治疗
下列哪项不属于甘草的不良反应A.水肿 B.血钾降低 C.水钠潴留 D
以下物质中毒病例中,临床可以应用特殊试剂明确诊断的是A.硝西泮B.苯妥英钠C.苯
在域名总数最多的报告中,宽带用户数约是手机网民人数的多少倍?A.2.9倍
在城市规划调查中,社会环境的调查不包括()。A.人口的年龄结构、自然变动、
民事法律行为以意思表示为核心,下列关于意思表示的表述正确的是( )。A.单方民事
下列关于本量利分析基本假设的表述中,不正确的是()。A.产销平衡 B.产品产
根据《建筑工程建筑面积计算规范》(GB/T50353-2005),应计算建筑面积
以建筑物或构筑物各个扩大的分项工程和扩大的结构构件为对象编制的定额是()。
最新回复
(
0
)