首页
登录
职称英语
London’s public transport system is no longer the "sick man" but the jewel i
London’s public transport system is no longer the "sick man" but the jewel i
游客
2024-08-23
15
管理
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions: [br] The word " scrutinizing" in Line 1, Paragraph 2 means______.
选项
答案
examining/inspecting
解析
(文章第二段提到International Olympic Committee scrutinizing Britain’s chances国际奥委会在调查伦敦的交通系统,由此可知scrutinizing的含义。)
转载请注明原文地址:https://tihaiku.com/zcyy/3731914.html
相关试题推荐
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
RockwellAutomationPowerSystemsLtdRockwellAutomation,a
RockwellAutomationPowerSystemsLtdRockwellAutomation,a
RockwellAutomationPowerSystemsLtdRockwellAutomation,a
Whichwordistheoddoneout?London,Paris,Dublin,TheHague,ViennaTheHague
随机试题
以下各种引起火灾的诱因中,()一直居于各类火灾原因的首位。A.电气因素
要减少测定结果的偶然误差,有效的办法是()。A.增加测定次数 B.进行对照
蒸汽热力网的设计流量()。A.应按各用户的最大蒸汽流量之和乘以同时系数确定
出血热病毒属于下列哪一种基因类型的病毒A.不分节段 B.正链RNA C.双链
二尖瓣狭窄的早期病理生理改变中,不会出现的是A.肺静脉压升高 B.左心房压升高
关于臀位妊娠下述哪项处理不恰当A.骨盆入口轻度狭窄时可给阴道试产机会 B.破水
注:含“E”的年份为预估或预测数值。 根据预测,2021年该地区云计算
( )是由中证指数公司编制,用以反映A股市场整体走势的指数。A.中证全债指数
患者,女,30岁。妊娠3个月,胎漏下血,面色不华,手足不温,用药应首选的药物是(
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
最新回复
(
0
)