首页
登录
职称英语
London has become a cycle friendly zone after the launch of a new bike hire
London has become a cycle friendly zone after the launch of a new bike hire
游客
2024-08-03
19
管理
问题
London has become a cycle friendly zone after the launch of a new bike hire scheme. It has been designed to encourage more people to cycle in and around central London.
So how does it work? First you have to sign up to the scheme to be sent a key. The key will unlock one of the bikes, which are kept at docking stations(停车点)in and around central London. You have to pay for the key and then you pay as you go, for the length of time you use the bike.
Transport for London, which runs the scheme, are hoping to have 6 000 bikes and 400 docking stations in place by the end of the year. The new hire system is hoping to ease bad traffic in London and is expected to generate up to 40 000 extra cycle trips a day into the city center.
London Mayor Boris Johnston launched the scheme and said London had been filled with thousands of gleaming machines that will transform the look and feel of our streets and become as commonplace on our roads as black cabs and red buses.
However, there have been a few problems since the scheme was launched last Friday. On the first day some people found they couldn’t dock their bike properly and their usage of the bike had not registered. Transport for London did admit they had been expecting a few teething problems(计划初期的困难)and have said they would waive(免除)the charges for the first day as a gesture of goodwill.
Some other people have criticized the lack of docking stations and locks for the bikes as well as the price it costs to hire the bicycles.
Despite the comments, the green-thinking London mayor still seems very positive about things. He said that his activity for the capital to become the greatest big cycling city in the world has taken a big pedal-powered push forwards. [br] At first the problems of the scheme lie in the fact that______.
选项
A、some people don’t know how to use the bike
B、some people find problems in placing the bike and registration
C、some people use the bike without registration on purpose
D、some people don’t want to launch the scheme from the beginning
答案
B
解析
由题干中的problems和the scheme定位到第五段第一句.第五段前两句提到,该项目在上周五实施的第一天就出现了一些问题,一些人不能正确停放自行车,而且自行车的使用没有被有关管理人员登记。B)为该句的同义表述。
转载请注明原文地址:https://tihaiku.com/zcyy/3703412.html
相关试题推荐
[img]2018m1x/ct_eyyjsbz2016j_eyyjsbreada_0132_201712[/img]London,England—V
[img]2018m1x/ct_eyyjsbz2016j_eyyjsbreada_0132_201712[/img]London,England—V
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
OneofLondon’smostbeautifulgardensisbeingtransformedintotheancient
随机试题
Whensupplyexceedsdemandforanyproduct,pricesare______tofall.A、timelyB
ResearchersreportthatobesityrelatestoDNA.Somechildrengetobese【C1】_
压力表损坏或压力表进水管路堵塞会导致湿式报警阀阀前阀后压力表显示不同。
第1胎,41周妊娠,头浮,试产4h,宫缩50s/2~3min,胎心132次
材料:下面是陈老师设计的“大洲和大洋”一课的教学目标: (1)了解世界海陆分布
某委托监理的工程,施工合同工期为20个月,土方工程量为28000m3,土方单价为
在PowerPoint中,能同时观看到多张幻灯片设计效果的“视图”的是()。A
宏观经济政策的主要目标包括充分就业、价格稳定、经济增长和国际收支平衡。( )[
商业银行风险管理的主要策略是风险分离、风险缓解、风险转嫁、风险规避、风险赔偿。(
银行业自律组织的章程应当报国务院银行业监督管理机构备案。
最新回复
(
0
)