首页
登录
职称英语
London has become a cycle friendly zone after the launch of a new bike hire
London has become a cycle friendly zone after the launch of a new bike hire
游客
2024-08-02
16
管理
问题
London has become a cycle friendly zone after the launch of a new bike hire scheme. It has been designed to encourage more people to cycle in and around central London.
So how does it work? First you have to sign up to the scheme to be sent a key. The key will unlock one of the bikes, which are kept at docking stations(停车点)in and around central London. You have to pay for the key and then you pay as you go, for the length of time you use the bike.
Transport for London, which runs the scheme, are hoping to have 6 000 bikes and 400 docking stations in place by the end of the year. The new hire system is hoping to ease bad traffic in London and is expected to generate up to 40 000 extra cycle trips a day into the city center.
London Mayor Boris Johnston launched the scheme and said London had been filled with thousands of gleaming machines that will transform the look and feel of our streets and become as commonplace on our roads as black cabs and red buses.
However, there have been a few problems since the scheme was launched last Friday. On the first day some people found they couldn’t dock their bike properly and their usage of the bike had not registered. Transport for London did admit they had been expecting a few teething problems(计划初期的困难)and have said they would waive(免除)the charges for the first day as a gesture of goodwill.
Some other people have criticized the lack of docking stations and locks for the bikes as well as the price it costs to hire the bicycles.
Despite the comments, the green-thinking London mayor still seems very positive about things. He said that his activity for the capital to become the greatest big cycling city in the world has taken a big pedal-powered push forwards. [br] At first the problems of the scheme lie in the fact that______.
选项
A、some people don’t know how to use the bike
B、some people find problems in placing the bike and registration
C、some people use the bike without registration on purpose
D、some people don’t want to launch the scheme from the beginning
答案
B
解析
由题干中的problems和the scheme定位到第五段第一句.第五段前两句提到,该项目在上周五实施的第一天就出现了一些问题,一些人不能正确停放自行车,而且自行车的使用没有被有关管理人员登记。B)为该句的同义表述。
转载请注明原文地址:https://tihaiku.com/zcyy/3701715.html
相关试题推荐
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
SmokinghasbecomesociallyunacceptableintheUS,inpartduetothehealt
随机试题
Iftherewerenosubjunctivemood,English_________mucheasiertolearn.A、could
FightinginNatureInnature,fightingissuchanever-p
Thedisappearanceofherpaperhasneverbeen______.A、countedforB、lookedupC、
闸室底板必须具有足够的()。A.整体性 B.坚固性 C.抗渗性 D.耐
系统说明书应达到的要求包括?()。①全面②系统③准确④详实⑤清晰⑥重复A.①②
初产妇,孕40周,胎儿纵轴与母体纵轴相互垂直,血压正常,胎心140/min。检查
薪酬管理制度的制定应当科学、合理,并长期稳健可持续发展相适应,包括的内容有(
在行政诉讼中,下列哪些证据材料不能作为人民法院定案的依据?()A.行政机关严重违
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
下列哪项不是感染性心内膜炎的临床表现A、Roth点 B、JAnEwAys结
最新回复
(
0
)