Directions: The following is a patent. After reading it, you should give brief answers to the 5 questions (No. 56 through No. 60) that follow. The answers should be no more than 3 words. They should be written after the corresponding numbers on the Answer Sheet.
United States Patent[19] [11] 4,044,808
Kolonia [45] Aug. 30, 1977
[54] SPLITTING ASSEMBLY
[76] Inventor: Robert A. Kolonia, RD No. 3, Box 318, Agnes Lane, Milford, N. J. 08848
[21] Appl. No: 688, 287
[22] Filed: May 20,1976
[55]Int. C1. …… A47J 4/02; B26B 23/00;
B27L 7/00
[52]U.S. C1. …… 145/2R;144/193 C;
[58]Field of Search …… 145/2; 144/193 C;
144/193 D
[56] References Cited
U.S. PATENT DOCUMENTS
561,000 5/1896 Karns ……… 145/2R
1,272,538 7/1918 Sandidge …… 145/2R
3,749,365 7/1973 Van Gompel … 254/104
3,865,163 2/1975 Root …… 144/193A
3,982,572 9/1976 Kortendick …… 254/104
FOREIGN PATENT DOCUMENTS
579,743 9/1925 France …… 145/2R
3,925 6/1919 Netherlands …… 145/2R
Primary Examiner-James L. Jones, Jr.
Assistant Examiner-J. T. Zatarga
Attorney, Agent, or Fim-King, Price & Markva
[57] ABSTARCT
The device comprises a head portion having a cutting edge with a pair of lever members mounted on opposing sides of the head portion. The lever members are pivotally (枢轴的 ) mounted at one end thereof to move in a crossed relationship with respect to each other and to swing the outer end thereof from resting position outwardly with respect to the head portion. The outer end of each lever member has a structural configuration effective to cause the swinging movement of the lever members upon contact with the’ object to be split. The outer end of each lever member contacts the object immediately after the cutting edge contacts the object. The lever members are effective to provide forces via their end portions against opposing sides of a cut formed by the utting edge and thereby enhance splitting of the object against which the cutting edge had been thrust. The lever members are mounted to bosses directly attached to the head portion.
14 Claims, 7 Drawing Figures [br]
选项
答案
Splitting Assembly
解析
从标有[54]的地方可知。
转载请注明原文地址:https://tihaiku.com/zcyy/3661062.html
相关试题推荐
ToolsPTYLimitedCompanyisseekingapplicantsforthefollowingpositions:
ToolsPTYLimitedCompanyisseekingapplicantsforthefollowingpositions:
Directions:Thefollowingisapatent.Afterreadingit,youshouldgivebri
LiHuaisthemonitoroftheclass,soheshould______chargeofthismatter.A、
Thefollowingisalistoftermsaboutthepress.Afterreadingit,youare
Thefollowingisalistoftermsaboutthepress.Afterreadingit,youare
Thefollowingisaweatherreport.Afterreadingit,youshouldgivebriefa
Thefollowingisaweatherreport.Afterreadingit,youshouldgivebriefa
Thefollowingisaweatherreport.Afterreadingit,youshouldgivebriefa
Thefollowingisaweatherreport.Afterreadingit,youshouldgivebriefa
随机试题
HowtoApproachDiscursiveWriting?Howtoimprovetheef
Kevin:IamafraidI’vespiltinkoverthetablecloth.Tommy:______A、Oh,neve
Inordertoworkheretheforeignerneedsaworkpermit,whichmustbeappl
A.捏法 B.振法 C.拍捶法 D.擦法 E.抹法用手指或手掌按压穴位或
"近期和中期效果评价"又称为A.形成评价 B.过程评价 C.效应评价 D.
脑对客观事物个别属性的反映是( )。A.知觉 B.感觉 C.直觉 D.错
邮政服务质量指标主要包括()。A:服务态度 B:邮政局所的营业时间 C:经办
根据《标准施工招标文件》(2007年版),承包人向监理人报送竣工验收申请报告,工
下列钢筋连接方法中,不属于机械连接的方法是( )。A.套筒挤压连接 B.钢丝
关于施工质量计划,下列说法正确的是()。 A.施工质量计划应由业主组
最新回复
(
0
)