首页
登录
职称英语
It was suggested that the construction______ahead of time.A、is completedB、was c
It was suggested that the construction______ahead of time.A、is completedB、was c
游客
2024-06-22
14
管理
问题
It was suggested that the construction______ahead of time.
选项
A、is completed
B、was completed
C、be completed
D、must complete
答案
C
解析
本题考查虚拟语气。虚拟语气用在包含suggest,demand,propose等表示建议、命令等的主语从句、宾语从句中时,从句谓语动词常为“(should+)动词原形”。又由于从句中的主语the construction与后面的动词是被动关系,故本题答案为C)。
转载请注明原文地址:https://tihaiku.com/zcyy/3645161.html
相关试题推荐
Somestudieshavesuggestedthatlongperiodsoftypingandincorrectworkhabit
Comparedwith"paperbacks",asissuggestedinthispassage,"proper"booksare
Comparedwith"paperbacks",asissuggestedinthispassage,"proper"booksare
Whenimaginativescientistsfirstsuggestedthepossibilitythatonepersoncoul
Thattreelookedasifit______foralongtime.A、hasn’twateredB、didn’twater
TimeislimitedandIcan______finishmyworkintime.A、almostB、evenC、nearly
Ifyouwanttogotoseeadoctor,you’dbetter______aheadoftime.A、makeana
______foryourhelpwecouldnothavefinisheditintime.A、InspiteofB、Butf
______thestorm,theshipwouldhavereacheditsdestinationontime.A、ButforB
Hospitaldoctorsdon’tgooutveryoftenastheirworktakes______theirtime.A、a
随机试题
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.GIVING
ItiscommonlybelievedintheUnitedStatesthatschooliswherepeoplego
Forthispart,youareallowed30minutestowriteashortessayentitledRespec
下列需要进行建筑物桩基沉降验算的是()。A.地基基础设计等级为甲级的建筑物桩
criticalpathforaprojectistheserie
A.生物安全柜本身无风机 B.层流技术净化空气 C.柜体完全气密 D.压力
A.腺病毒性肺炎 B.金黄色葡萄球菌肺炎 C.呼吸道合胞病毒性肺炎 D.肺
某政府投资工程于2009年6月组织施工招标资格预审。资格预审文件采用《标准施工招
甲、乙公司均为增值税一般纳税人,适用的增值税税率为13%。甲公司接受乙公司投资
在对综合概算和总概算进行审查时,如概算总投资超过原批准投资估算达到一定比例,需要
最新回复
(
0
)