首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-06-14
52
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969.This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-eight years ago?
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案。
转载请注明原文地址:https://tihaiku.com/zcyy/3633267.html
相关试题推荐
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]M:Howdidyoulikethefireworkslastnight?W:Ireallydidn’t
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:WhatcanIdoforyou?M:Yes,Iwouldlikesometicketsforn
[originaltext]M:MayIhelpyou?W:Yes,myfriendisfinishingmiddlehighsch
[originaltext]W:Gotobedearlyandgetsomerest,Jack.M:ButIhavetostu
随机试题
PatentPatents【T1】______thechancesofinventorstomakemoneyfrom【T2】_
Obtaininggoodhealthinsuranceisarealnecessitywhileyouarestudyingo
经过十多年的建设和发展,中国高铁(high-speedrailway)已逐步成熟化,现在已成为中国在新时代的一张亮丽的名片。中国高铁为人们构筑起了生活新
[originaltext]M:Iattendedthechildren’sconcertyesterday,andIgotquitea
数据备份常用的方式主要有:完全备份、增量备份和()。A.逻辑备份 B.按
水资源评价内容包括水资源数量、水资源质量、水资源利用评价及以下哪项?( )A.
商业银行使用押品缓释信用风险应以全面评估债务人的偿债能力为前提,这体现的是商业银
103.在带电的电流互感器与短路端子之间导线上进行任何工作,应有严格的安全措施,
一组数据的标准差为20,均值为100,则这组数据的离散系数为()。A.0.1
1.背景 某施工单位中标仪表着陆系统和全向信标台安装合同,合同约定工期6个月。
最新回复
(
0
)