首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-06-14
47
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969.This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-eight years ago?
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案。
转载请注明原文地址:https://tihaiku.com/zcyy/3633267.html
相关试题推荐
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]1.M:Doyouknowwhenthecoachescomein?W:I’vejustcalledt
[originaltext]M:Howdidyoulikethefireworkslastnight?W:Ireallydidn’t
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Pardonme,officer!M:Yes?W:WearelookingfortheShanghai
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:Theshirtsellsfor3dollarseach,butit’s5ifyoubuytwo.
[originaltext]W:WhatcanIdoforyou?M:Yes,Iwouldlikesometicketsforn
[originaltext]M:MayIhelpyou?W:Yes,myfriendisfinishingmiddlehighsch
[originaltext]W:Gotobedearlyandgetsomerest,Jack.M:ButIhavetostu
随机试题
Thewitnessclaimed______amanintheparty,buthewasnotsurewhetherthis
Yearsago,acigarettecommercialaskedifyouweresmokingmore,butenjoyi
A--creditanalysisB--basepriceC--enquiry
酶偶联法中作为试剂用于测定化学物浓度或酶活性的酶称为________。
土达到饱和状态时,饱和度为0。()
当检测沥青喷洒数量时,如果两个测定值的误差不超过平均值的()时,取平均值作为洒布
内部控制管理职能部门是内部控制的()。A.“第一道防线” B.“第二道防线”
下列字符中,其ASCII码值最大的是( )。A.9 B.D C.a D
如何合理配置资源,使有限的资金发挥最大的效用,是投资管理中资金投放所面临的重要问
下列()不属于承包人的主要义务。A.对工程进行垫资 B.不得违法转包
最新回复
(
0
)