首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-06-07
43
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others.
The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different of the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The Command spot are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spots send no signal, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station, the other trains will then automatically move slower. So there is no danger of accident on the line.
选项
A、The workers on the underground platforms were replaced by machines.
B、It became the first completely automatic railway in the world.
C、A completely automatic line was added to its network.
D、Its trains became computer-controlled.
答案
B
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3623533.html
相关试题推荐
[originaltext]Manychildrenfirstlearnthevalueofmoneybyreceivingan
[originaltext]Manychildrenfirstlearnthevalueofmoneybyreceivingan
[originaltext]TheyoungexecutiveweavingthroughthetrafficinhisBMW,o
[originaltext]TheyoungexecutiveweavingthroughthetrafficinhisBMW,o
[originaltext]TheyoungexecutiveweavingthroughthetrafficinhisBMW,o
[originaltext]W:Morning,Mr.Park.M:Comehere,MissLi,Ihavesomethingto
[originaltext]W:David,sorryformyschoolboardmeetinglastnightsolate.I
[originaltext]W:David,sorryformyschoolboardmeetinglastnightsolate.I
[originaltext]M:Howdoyoulikethissuit?Withthisnewjob,I’vegottostar
[originaltext]M:Howdoyoulikethissuit?Withthisnewjob,I’vegottostar
随机试题
JohnWilliams’houseismadeof[originaltext]Morethan40yearsago,John
Whatdoesthepassagemainlydiscuss?[br]Theword"it"inline18referstoA、o
[originaltext]OfficialsinnorthernBrazilsayafour-dayriotatanotoriously
对仪器设备赋予了唯一标识编号,其目的是对公路水运检测机构的设备进行规范管理,编号
女性,23岁,有习惯性流产史,均发生在孕5~6个月,目前孕4个月,昨日起有阴道流
影响商圈形成的内部因素有()。A.经营商品的种类 B.店铺规模 C.经营水
传统的数学教育往往从基本的概念或定义出发,以简练的方式合乎逻辑地推演出所要求的结
A.5%阿昔洛韦软膏 B.口腔溃疡膏 C.鱼石脂软膏 D.克霉唑软膏 E
投资项目决策分析与评价的基本要求包括贯彻落实科学发展观、资料数据准确可靠和()
某工程于2017年3月5日完工,承包人一周后向发包人提交了竣工验收报告。发包人收
最新回复
(
0
)