首页
登录
职称英语
The rebuilding of the World Trade Center is in many ways a memorial to those
The rebuilding of the World Trade Center is in many ways a memorial to those
游客
2024-05-15
52
管理
问题
The rebuilding of the World Trade Center is in many ways a memorial to those who lost their lives in the 2001 September 11 attacks and it is a tribute that these buildings will also be built to the highest green building standards. N.Y. Governor George Pataki announced that the Freedom Tower, World Trade Center Office Towers 2, 3, and 4, as well as the World Trade Center Memorial and Memorial Museum will all be designed to achieve the U.S. Green Building Council’s (USGBC) LEED Gold certification requirements.
This groundbreaking announcement was made five years after the devastating attacks and includes an entire package of energy and environmental measures that will be incorporated into the design of the World Trade Center redevelopment. Plans for the Freedom Tower and other facilities at the World Trade Center site will feature state-of-the-art energy technologies to better protect environmental resources; utilize renewable energy sources, and maximize energy efficiency.
These buildings join over half a billion square feet of construction projects already involved with the LEED program, including World Trade Center 7, which was certified as LEED Gold in March 2006. These facilities will also be built to a design standard that is 20 percent more efficient than the New York Energy Conservation Construction Code.
"The decision to achieve LEED Gold is a fitting tribute to the importance of the reconstruction of Ground Zero. Using LEED sends a clear message that our buildings must be safe, healthy places for us to live and work," said Rick Fedrizzi, President, CEO & Founding Chair, U.S. Green Building Council. "New York is to be commended for its leadership; the World Trade Center buildings will stand as a symbol of New York’s Courage and commitment to a healthy and sustainable future."
Governor Pataki also announced an agreement with Silverstein Properties that calls for the Freedom Tower and each of the World Trade Center Office Towers to utilize cutting edge fuel cell technology to increase efficiency and provide secure clean on-site power generation. These fuel cell installations, totaling 4.8 MW of power generation, will together constitute one of the largest fuel cell installations in the world.
"The redevelopment will be a global example of green building design and a constant reminder of our commitment to break the cycle of dependence on foreign energy," said the Governor. "By moving forward with state-of-the-art design and guidelines, New York will once again show the world our ingenuity, innovation and commitment to building a stronger, brighter future for all."
"LEED certification for the rebuilding of the World Trade Center complex demonstrates the resiliency (恢复) of the United States," Fedrizzi continued. "Not only is our nation restoring the areas devastated by the terrorist attacks, but we are also doing so in a way that highlights our commitment m—and belief in—the future." [br] LEED Gold certification requires ______.
选项
A、the highest standard of green building design
B、the application of advanced energy technology
C、efficiency of using energy
D、safe clean on-site generation of power
答案
C
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3599916.html
相关试题推荐
Theyaimedtomakeanimportantrailroad_________andindustrialcenterofthei
Themedicalcentercouldn’t______whichgroupthefluvirusbelongedtoowingt
Thecityisanimportantrailroad______andindustrialandconventioncenter.A、
[originaltext]Recentlyafive-yearstudywasconductedbytheCenterforCh
[originaltext]Recentlyafive-yearstudywasconductedbytheCenterforCh
[originaltext]Recentlyafive-yearstudywasconductedbytheCenterforCh
[originaltext]Recentlyafive-yearstudywasconductedbytheCenterforCh
[originaltext]M:Hey,Amy,whereareyouoffto?W:TotheRecreationCenter.I
[originaltext]M:Hey,Amy,whereareyouoffto?W:TotheRecreationCenter.I
[originaltext]M:Hey,Amy,whereareyouoffto?W:TotheRecreationCenter.I
随机试题
SwinefluhasinfectedmorethanamillionAmericansandisinfectingthousa
FiveCommonMistakesinConversationsandTheirSolutionsI.Notlist
【B1】[br]【B11】[originaltext]Thereissomethinghardtoresistaboutcherri
电气火灾按其发生在电力系统的位置不同,分为()。A.变配电所火灾 B.电气
某回路的主保护动作时间为1s,后备保护动作时间为2s,断路器全断开时间为
病人,男,25岁。主诉间断流涕带血伴左侧鼻塞,左耳听力下降3个月,左颈有无痛性肿
审定建设工程设计方案时,不仅审核其走向、线型、断面是否符合相关技术规范,尚应考虑
在新的城镇化机制的作用下,我国的城镇化进程出现了一些新的发展趋势,以下说法正确的
国家产业政策的变化使得企业进行组织变革,则驱动该企业变革的因素属于()。A.技术
根据《监察法》规定,监察机关在调查职务违法和职务犯罪过程中,为了查明案情,收集证
最新回复
(
0
)