首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2024-05-14
72
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-nine years ago?
转载请注明原文地址:https://tihaiku.com/zcyy/3598010.html
相关试题推荐
[originaltext]Oneofthemaincomplaintsofcityresidents,notsurprisingl
[originaltext]Youshouldnotfearspidersbecauseoftheirpoison.Ofallt
[originaltext]W:Today’sgueston"ScienceUpdate"isDavidBrown.Dr.Brown,
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
[originaltext]W:NewYorkisafascinatingplaceandithasanotherinteresting
随机试题
实物财产清查的方法有()。A.实地盘点法 B.技术推算法 C.抽样盘存法
输尿管的第三个生理性狭窄位于A.进入膀胱壁内处 B.输尿管上段 C.输尿管中
下列不属于肾损伤并发症的是A.肾周脓肿、肾盂肾炎和脓肾 B.肾下垂、肾畸形、肾
铁染色的基本原理是A.普鲁士蓝法B.钙-钴法C.偶氮偶联法D.氧化酶法E.以上都
例行巡视钢构支架防腐涂层()。完好、无锈蚀$;$排水孔畅通$;
某单位2014你那年终奖评比中,良好等级的人数占总人数3/5。2015年年终评比
观看视频,根据要求回答问题。 题目:《体罚》 1998年9月4日晚6时,下
(2020年真题)根据会计法律制度的规定,下列部门中,可以对会计工作实施政府监督
对业主合同管理而言,项目总承包管理模式的特点是()。A、合同关系简单,故合同管理
通常情况下,基坑土方开挖的明排水法主要适用于()。A.细砂土层 B.粉砂土层
最新回复
(
0
)