首页
登录
职称英语
The concept of obtaining fresh water from icebergs that are towed to populat
The concept of obtaining fresh water from icebergs that are towed to populat
游客
2024-05-06
49
管理
问题
The concept of obtaining fresh water from icebergs that are towed to populated areas and arid regions of the world was once treated as a joke more appropriate to cartoons than real life. But now it is being (47)______ quite seriously by many nations, especially since scientists have warned that the human race will (48)______ its fresh water supply faster than it runs out of food.
Glaciers are a possible (49)______ of fresh water that has been overlooked until recently. Three-quarters of the Earth’s fresh water supply is still tied up in glacial ice, a reservoir of (50)______ fresh water so immense that it could (51)______ all the rivers of the world for 1,000 years. Floating on the oceans every year are 7,659 trillion metric tons of ice encased in 10,000 icebergs that break away from the polar ice caps, more than ninety percent of them from Antarctica.
Huge glaciers that (52)______ over the shallow continental shelf give birth to icebergs throughout the year. Icebergs are not like sea ice, which is formed when the sea itself freezes, rather, they are formed (53)______ on land, breaking off when glaciers spread over the sea. As they drift away from the polar region, icebergs sometimes move mysteriously in a direction (54)______ to the wind, pulled by subsurface currents. Because they melt more slowly than smaller pieces of ice, icebergs have been known to drift as far north as 35 degrees south of the equator in the Atlantic Ocean. To control them and (55)______ them to parts of the world where they are needed would not be too difficult.
The difficulty arises in other technical matters, such as the prevention of rapid melting in warmer climates and the funneling(传送) of fresh water to shore in great volume. But even if the icebergs lost half of their volume in towing, the water they could provide would be far cheaper than that produced by desalinization(脱盐), or (56)______ salt from water.
Word Bank:
A. removing I. approximately
B. stretch J. considered
C. deriving K. similar
D. entirely L. source
E. untapped M. ensured
F. resource N. sustain
G. outgrow O. steer
H. opposite
[br]
选项
答案
A
解析
空白前面的or表明其后的成分用于解释desalinization,由于介词by的限定,故此处需填入动词的现在分词,且能与from连用。词库中的removing和deriving都能与from连用,但根据desalinization来判断,要把盐从水中分离出来,所以选择removing(除去),而不是deriving(源自)。
转载请注明原文地址:https://tihaiku.com/zcyy/3586460.html
相关试题推荐
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopulat
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopulat
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopulat
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopulat
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
Theconceptofobtainingfreshwaterfromicebergsthataretowedtopopula
随机试题
InflationInflation,asaneconomicphenomen
拱桥的主要承重结构是()。A、拱箱 B、拱肋 C、腹板 D、桥面结
根据新的《中华人民共和国公司法》的规定,董事会对股东会负责,行使职权不包括()
平板电视大行其道的今天,一种比其薄十厘米,仿其外型的超薄显像管出现在家电卖场中,
自动喷水灭火系统中,末端试水装置应每()进行一次放水试验。A.日 B.月
社会服务机构主管可授权的内容包括()A.可以分派任务 B.可以授予职位 C
患者,47岁,诊为大肠湿热所致的痢疾,症见大便脓血,里急后重,发热腹痛,舌红苔黄
单位工程预验收的程序中,监理机构应编写质量评估报告,并经()签字后报建设单位。
应急演练实施是将演练方案付诸行动的过程,是整个演练程序中的核心环节。下列内容中,
铲斗挖泥船的挖掘与提升铲斗同步挖掘法适用的土质是()等。A.密实砂 B.硬塑黏
最新回复
(
0
)