首页
登录
职称英语
[originaltext] It is barely half a century since parts of the Thames were de
[originaltext] It is barely half a century since parts of the Thames were de
游客
2024-04-12
49
管理
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £10 million open-air swimming pool in the middle of the Thames in Central London.
(12)Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.(13)Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
(14)The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic.(15)Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £300,000 to cover consultancy costs and other fees, which would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
Questions 12 to 15 are based on the passage you have just heard.
12. What can be learned about Germany?
13. What do people concern about the project?
14. What is the function of the glass partition?
15. Where is the money of the project likely to come from?
选项
A、To separate the changing rooms from the pool.
B、To provide a path to the swimming area.
C、To make the pool shallow enough for children.
D、To protect people from waves caused by river traffic.
答案
D
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3551516.html
相关试题推荐
[originaltext]Hello,I’mCallumRobertsonandyou’relisteningtothemusic
[originaltext]Hello,I’mCallumRobertsonandyou’relisteningtothemusic
[originaltext]Hello,I’mCallumRobertsonandyou’relisteningtothemusic
[originaltext]Hello,I’mCallumRobertsonandyou’relisteningtothemusic
[originaltext]AbeetleinvasionintheUnitedStateshaskilledatleasttw
[originaltext]W:Hi,Dr.Hyde.M:So,whatseemstobetheproblemtoday?W:We
[originaltext]W:Hi,Dr.Hyde.M:So,whatseemstobetheproblemtoday?W:We
[originaltext]W:Dad,youalwaysloveme,don’tyou?M:Sure.But,wait,wait.
[originaltext]W:Themountainseemstohavegrown,IfeelsodizzywhenIclimb
[originaltext]W:Themountainseemstohavegrown,IfeelsodizzywhenIclimb
随机试题
Superstitionisabiasedword.Lookupalmostanydictionarydefinitionand
Forthispart,youareallowed30minutestowriteanessaycommentingonthe
根据上述资料,以下说法正确的是:A.2021年1—2月份,各地区房地产开发投
以下股票在深港通下的港股通范围内的有()。 ①恒生综合大型股指数的成分股
A.遮光剂B.增稠剂C.防腐剂D.增塑剂E.矫味剂硬胶囊囊壳中甘油的作用是
Thechangeinthatvillagewasmiraculou
A.两玩具小车的速度大小相同 B.两玩具小车各运动20m,所用时间相同 C.
按照经济内容分类,以下属于“损益类”的会计科目是()。A.应收账款 B.存
根据《建设工程质量管理条例》,存在下列( )行为的,可处10万元以上30万元以下
根据《建设工程工程量清单计价规范》,采用工程量清单招标的工程,投标人在投标报价时
最新回复
(
0
)