首页
登录
职称英语
It is recommended that the project______until all the preparations have been mad
It is recommended that the project______until all the preparations have been mad
游客
2024-01-19
56
管理
问题
It is recommended that the project______until all the preparations have been made.
选项
A、is not started
B、will not be started
C、not be started
D、is not to be started
答案
C
解析
题干大意为:建议在一切准备工作做好之后再开始这一项目。动词recommend表示“建议”,其后宾语从句须采用“(should)+动词原形”的虚拟语气形式,并且是否定形式。
转载请注明原文地址:https://tihaiku.com/zcyy/3376533.html
相关试题推荐
[originaltext] (1)Aspartofathree-yearproject,agroupofAmericanhighs
AccordingtorecentUnitedStatesDepartmentofAgriculture(USDA)projection
AccordingtorecentUnitedStatesDepartmentofAgriculture(USDA)projection
Ifthebuildingproject______bytheendofthismonthisdelayed,theconstructi
Hewasreallydepressedwhenhisprojectproposalwas_____forthethirdtime.A、
SpeakerA:Hi,John.Nicetomeetyouagain.Howisyourprojectgoing?Speaker
Heisopposed(to)theproject(forthereasonwhy)itisnot(feasible)(forth
Thedirectorrecommendedshe______Englishbeforegoingabroad.A、havetostudyB、
Themeetingwillbeputoff______noadequatepreparationsaremade.A、innocase
Theyrecommended______smallerheatingandcoolingsystems.A、touseB、tobeused
随机试题
[A]mysterious[I]moment[B]collaboration[J]scramble[C]bound[K]contes
《建筑工程施工质量验收统一标准》GB50300一2013规定隐蔽工程在隐蔽前,施
果蔬的呼吸热与()有关。A.贮藏温度 B.含水量 C.密度 D.导热系
某项目包含的活动如下表所示,完成整个项目的最短时间为()周。不能通过缩短活动(
“旅游不文明行为记录”形成后,旅游主管部门应当将相关信息通报或送达当事人本人,并
患者,男,50岁。反复浮肿,尿血3年。症见:面色无华,少气乏力,易感冒,午后低热
林某与甲房地产经纪公司签订房屋委托购买合同。合同约定,甲公司为林某购买某小区一套
上个世纪八十年代,A公司针对高收入的消费群体,推出了T牌卫生纸,当时使用T牌卫生
根据工程施工质量验收的基本规定,对于主控项目,合格质量水平的错判概率和漏判概率均
某柴油机工厂连杆班职工徐某用砂机抛光转动中的柴油机凸轮轴时,凸轮轴上的法兰盘螺栓
最新回复
(
0
)