首页
登录
职称英语
______with the size of the whole earth, the highest mountain does not seem high
______with the size of the whole earth, the highest mountain does not seem high
游客
2024-01-19
61
管理
问题
______with the size of the whole earth, the highest mountain does not seem high at all.
选项
A、When compared
B、Compare
C、While comparing
D、Comparing
答案
A
解析
词语用法题。句意:如果和整个地球相比,最高的山峰也显得没有那么高了。mountain是被用来进行比较的,所以compare在这里需要用被动语态。
转载请注明原文地址:https://tihaiku.com/zcyy/3374778.html
相关试题推荐
Westayedforthenightatthefootofthemountainand______toclimbitthen
Contrary_____alladvice,hestartedtoclimbthemountainduringastorm.A、onB
A(Lostinthought),sheB(didn’thear)thethunderC(tobegin)inthemountains
______thatthetradebetweenthetwocountriesreacheditshighestpoint.A、Durin
______withthesizeofthewholeearth,thehighestmountaindoesnotseemhigh
Ontopofthemountain______,aroundwhichweregreenthicktrees.A、didweseea
Theweather______usfromclimbingthemountain.A、dischargedB、disguisedC、distu
AsIgrewupinasmalltownatthefootofamountain,thevisittothevillage
Myuniversityliesinthenorthofthecity,around______highmountains.A、which
______withthesizeofthewholeearth,thehighestmountaindoesn’tseemhigh
随机试题
Treesareusefultomaninthreeveryimportantways:theyprovidehimwith
1/3+3/7=______16/21YoumustfirstfindtheLowestCommonDenominator(LCD)fort
A.必须无菌 B.细菌菌落总数应≤20cfu/g或≤20cfu/100cm,致
下列因素中,对确定采购策略会产生影响的有()。A.将采用的招标方式 B.将
建筑企业材料管理实行分层管理,一般分为管理层材料管理和()的材料管理。A.领导
软件维护工作包括多种类型。其中()的目的是检测并更正软件产品中的潜在错
电缆通道例行巡视项目包括()(A)电缆通道、夹层应保持整洁、畅通,无火灾隐患,不
A.缓和温燥之性 B.缓和苦寒之性 C.增强消食化积作用 D.增强健脾止泻
检查某班15岁学生50名,其中龋病者10人,龋失补牙数为:D=70,M=2,F=
除另有说明外,所有清单项目的工程量应以()为准,并以完成后的()计算
最新回复
(
0
)