首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2024-01-16
27
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $ 3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。定位到文章第二段第五句“They also say the pipeline could pollute their main water source,the Missouri River.”可知,他们认为这条管道可能会污染当地的主要水源——密苏里河,所以印第安人反对管道建设的一个原因是担心管道会污染水源一。A选项“因为工程耗资达38亿”,不是印第安人抗议的原因;C选项“因为很多人会因此而失业”和D选项“这将迫使很多人离开家园”均未在文中提及。故选B。
转载请注明原文地址:https://tihaiku.com/zcyy/3366796.html
相关试题推荐
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Thenewpowerplantisreported______withinthreeyears.A、havingbeencompleted
Newspapersarenotnearlyaspopulartodayastleywereinthepast.There
Newspapersarenotnearlyaspopulartodayastleywereinthepast.There
Ifyouareamemberofaclub,youmust______totherulesofthatclub.A、access
Theytoldmeitwouldbecheapbut_______itcostmenearly$500.A、ingeneralB、
He______havecompletedhiswork;otherwise,hewouldn’tbeenjoyinghimselfby
随机试题
Theroomisinaterriblemess;it______(can’tclean).can’thavebeencleaned情
Thenightisnotwhatitwas.Once,theearthwascasthalfinshadow.Then
直接影响人的活动效率,使活动得以顺利进行的个性心理特征称为()A.人格 B.
A.P(S4)和V(S5) B.V(S5)和P(S4) C.V(S4)和P(
在项目管理中,成本绩效分析应该包括发现成本差异为负的工作包,或者说低于以下哪项的
碳化深度值测量时,使用适当的工具在测区表面形成深度大于混凝土碳化深度的洞。采用一
下列关于主要评估资料的相关说法中,错误的是( )。A.对权属资料不完备、毁损、
人们为了保证学校中教育活动顺利进行而创立和形成的一种特有的文化是( )。A.校
A.龟板B.龙骨C.鳖甲D.牡蛎E.代赭石具有平肝潜阳、软坚散结、收敛固涩功效的
(2020年真题)下列交通安全设施中,能起诱导视线作用的有()。A.轮廓标 B
最新回复
(
0
)