首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2024-01-16
25
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] Which of the following is the main idea of the passage?
选项
A、The Dakota Access Pipeline will create more markets for oil and gas.
B、The Dakota Access Pipeline will create many job opportunities.
C、American Indians oppose the construction of an oil pipeline.
D、American Indians fight for equal voting rights.
答案
C
解析
主旨题。根据文章第一段内容可知,ETP公司期望在今年内完成输油管道建设,立岩苏族决定要终止1172英里长的输油管道建设,双方都没有妥协,可见双方矛盾所在。A、B、D三项文中均没有提及,故均可排除。选项C“美国印第安人反对修建输油管道。”符合题意,故选C。
转载请注明原文地址:https://tihaiku.com/zcyy/3366794.html
相关试题推荐
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thenewpowerplantisreported______withinthreeyears.A、havingbeencompleted
Ifyouareamemberofaclub,youmust______totherulesofthatclub.A、access
Allthearrangementsshouldhavebeencompletedprior______ourdeparture.A、inB、
Thereisno________tothehousefromthemainroad.A、accessB、avenueC、exposur
W:Theexperimenthasbeencompleted,hasn’tit?M:______A、Yes.Weneedanother
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
随机试题
______thelanguageinthetown,hefoundithardtogetapieceofwork.A、Notk
左边给定的是纸盒的外表面,下面哪一项能由它折叠而成?
用超声波法检测大体积混凝土的深裂缝深度时,应采用()。A.单面平测法 B.双
在商业银行受理贷款申请时,调查人员主要通过借款人的()及其与本行及他行业务状
3岁的乐乐活泼好动,但语言发展迟缓,只能说出“爷爷”“奶奶”等简单的词语。社会工
参与辅酶A组成的维生素是A.维生素B6 B.维生素PP C.叶酸 D.泛酸
Fordecades,farmersandenvironmentalist
A.兰科,块茎 B.百合科,鳞茎 C.天南星科,块茎 D.茜草科,根及根茎
事故经过 自来水改扩建工程是政府投资工程,属公益事业建设项目,该项目在原水厂
敏感性分析的目的在于寻求敏感因素,可以通过计算( )来确定。A.敏感度系数
最新回复
(
0
)