首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2024-01-16
31
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] Which of the following is the main idea of the passage?
选项
A、The Dakota Access Pipeline will create more markets for oil and gas.
B、The Dakota Access Pipeline will create many job opportunities.
C、American Indians oppose the construction of an oil pipeline.
D、American Indians fight for equal voting rights.
答案
C
解析
主旨题。根据文章第一段内容可知,ETP公司期望在今年内完成输油管道建设,立岩苏族决定要终止1172英里长的输油管道建设,双方都没有妥协,可见双方矛盾所在。A、B、D三项文中均没有提及,故均可排除。选项C“美国印第安人反对修建输油管道。”符合题意,故选C。
转载请注明原文地址:https://tihaiku.com/zcyy/3366794.html
相关试题推荐
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thenewpowerplantisreported______withinthreeyears.A、havingbeencompleted
Ifyouareamemberofaclub,youmust______totherulesofthatclub.A、access
Allthearrangementsshouldhavebeencompletedprior______ourdeparture.A、inB、
Thereisno________tothehousefromthemainroad.A、accessB、avenueC、exposur
W:Theexperimenthasbeencompleted,hasn’tit?M:______A、Yes.Weneedanother
IftheDakotaAccessPipeline(输油管道)iscompleted,itwillcarrynearlyhalf
随机试题
[originaltext]It’sgenerallyagreedthatserious,violentcrimehasreached
ChildAbuseDefinitionofChildAbuseChild
LED灯具安装位置应有较好的散热条件,且不应安装在潮湿场所。
下列填土可以作为一般建筑物的地基()。A:堆填时间超过8年的黏性土 B:堆填
私募股权二级市场投资通常以( )形式进行组织。A.合伙人 B.有限制 C.
属于浆细胞病的是A.淋巴细胞白血病B.骨髓增生异常综合征C.多发性骨髓瘤D.急性
()党纪国法的人,必将自食其果。A.忽视 B.无视 C.轻视 D.
下面中国古代诗人与其艺术风格对应不符的是() A.李白,唐代著名浪漫主义
简述现代企业人力资源管理各个历史发展阶段的特点。
根据《关于学习贯彻〈规划环境影响评价条例〉加强规划环境影响评价工作的通知》,推进
最新回复
(
0
)